301 Question Bank 1 Flashcards
(39 cards)
What system is used to schedule and track preventive maintenance?
SKED
Which document contain information on HAZMAT’s physical data, melting point, boiling point, flash point, toxicity, health effects, and first aid?
SDS
As a qualified maintenance person, what do you do upon completion of preventive maintenance?
immediately inform the WCS of completion or issues, and Sign the accountability log if maintenance action was completed
Who prepares the “Weekly” schedule?
Work Center Supervisor
Who review MRCs and promptly submits a PMS TFBR, whenever maintenance requirements are not fully understood and errors exist?
Work Center Supervisor
The work center supervisor can make pen and ink changes to which block on the MRC
Tools and materials
Who is responsible to review, approve and initial non-applicable procedural steps that are lined out?
LCPO
Who reviews and acknowledges PMS alerts?
DIVO
Who is responsible for effective operation of 3M within their department?
Department Head
Who is reponsible for sustaining the shipboard 3M program?
3MC
Who are the 3MCs, 3MO and command 3MA onboard
3MO - LCDR Curry
3MCM - EMCM Edjan
3MC - ETC Harris, EMC Wilkins, and EMC Devinney
3MA - OS2 Carcamo
Who is the ship’s 3M Manager
XO
Where would you verify your MIP
Against the LOEP
B9 in SYSCOM Contorl number B9 4FCD Y indicates what?
date code meaning November 0f 2019
What does the acronym LGL stand for?
Location Guide List
What information is listed on a LGL?
Name/nomenclature, Serial number, and location
What is the purpose of a Location Guide List (LGL)
Used with a controlling MRC when the MRC applies to a number of identical pieces of equipment
What must happen when scheduled maintenance is not accomplished?
A check note entry is annotated
A Maintenance Personse shoud notify the WCS when which sitautions occur?
Any doubt exists about capability, traininig or expereince to properly perform the maintenance requirement
What are maintenance requirements where all or part of the related MRC is performed when specific conditions are present or not met on the referencing MRC?
Conditional related maintenance
What are the steps to applying ORM
Identify hazards, assess hazards, make risk decisions, implement controls, and supervise
What is required when HAZMAT is transferred from the primary container to a secondary container?
A lable has to be attached
When does the 2nd check sign a tag?
After the 1st person signs a tag, 2nd person independently verifies the correct position and location of all tags
How do you perform a tag out audit?
Check all outstanding tags on each TORS for correct posting