301 Question Bank 4 Flashcards

(39 cards)

1
Q

What are the two types of Maintenance actions?

A

Preventive and Corrective

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the local 3M instructions?

A

CVN70INST 4790.2J

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is the number assigned to Tools, Parts, Material, and Test Equipment

A

SPIN

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What kind of information does the HMUG contain

A

Control measures, precautions, PPE, and spill controls for HAZMAT

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is an electronic file that groups test equipment by function or capability?

A

SCAT

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Who deteremines the maintenance workload of their personnel for a given week or quarter utilizing the forecasting report?

A

Work Center Supervisor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Who conducts weekly close-outs?

A

LCPO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Who is responsible for reviewing the CSMP? How often?

A

DIVO
Weekly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Who is repsonsible for providing training to departmental personnel and managing departmental 3M qualification?

A

D3MA

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Which response best describe the work center PMS manual

A

reflects that portion of the PMS Master file that is applicable to a particular work center

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What does LOEP stand for

A

List of effective pages

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

In the 43P1, 5000/005-A7 indicates what page and what are the series of numbers called?

A

SYSCOM MIP Contorl Number

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What are you looking for when verifying MRC to MIP

A

ensure MRC and MIP SYSCOM Control Number on the MRC match whats on the MIP

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What are you looking for when verifying MIP to LOEP

A

Make sure the MIP SYSCOM contorl number on the MIP matches whats on the LOEP

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What are you looking for when verifying LEOP to Change Page

A

Make sure ‘Date of Change’ and the ‘Date Entered’ match

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

The WCS cannot substitute what?

A

specific or specialty tools called out by description

17
Q

When conducting maintenance and there’s only one piece of equipment of its kind and no LGL, where can you find the equipment information?

A

Front page, top left of the MRC

18
Q

If multiple maintenance persons are assigned to a single maintenance action who signs for the completion of the maintenance?

A

The most senior maitnenance person

19
Q

What are maintenance requirements that must be accomplished concurrently with another maintenance requirement

A

Mandatory related maintenance

20
Q

Common safety charpters when conducting maintenance: B4

A

Hearing conservation

21
Q

Common safety charpters when conducting maintenance: B6

A

Respiratory protection

22
Q

Common safety charpters when conducting maintenance: C1

23
Q

Common safety charpters when conducting maintenance: C8

A

Working over the side/aloft

24
Q

What is the minimum required isolation for eletrical systems?

A

Requires only a single isolation point in each conductor path

25
Who is reponsible for the administration of their cognizant tag-out log?
Authorizing Officer
26
What is the purpose of a tag out audit?
to ensure active tags are hung in the correct location, position and inactive tags are not still in place
27
What symbol is used to mark a check complete
X
28
What symbol indicates an N/A check
Circle with slash
29
What symbol indicates mandatory related maintenance?
#
30
Which symbol following a peridocity code indicates that the procesure is intended to be scheduled an performed by either Ship's Force or Off-Ship Maintenance Perosnnel
++
31
What periodicity is D-1
Daily
32
What periodicity is M-1
Monthly
33
What are the non-calendar Periodicity codes
R - Situational requirements U - Unscheduled maintenance AP - Assessment Procedure LU - Lay-up SU - Start-up
34
What is FBR? What is it used for?
-Feedback Reports - used to identify problems with the PMS documentation or to request the addition or deletion of PMS coverage
35
When is equipemnt placed in IEM?
When a piece of equipement or system is intentionally placed in a hibernated state for a specific period with the intenion of reactivating that quipment or system at the end of the period
36
What is Status 'I' IEM
-Equipment not scheduled for corrective maintenance or overhaul -Equipment remain onboard -Will be inactive during extended period of time
37
Which category of IEM is accomplished when taking equipment out of IEM?
Start-Up maintenance
38
What does OMMS-NG stand for?
Organizational Maintenance Management System - Next Generation
39
How do you validate a piece of equipment
using the Equipment Validation sheet, verify serial number, lcoation, name plate data.