303 - WCS - All Questions Flashcards

(224 cards)

1
Q

What is a LOEP?

A

List of Effective Pages; list all MIPS and applicable maintenance for that work center

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Who is responsible to review, approve and initial non-applicable procedural steps that are lined out?

A
  • LCPO
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is a Local trigger?

A
  • A Local event that affects that particular piece of equipment which requires situational PMS to be accomplished
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

When does the 2nd checker sign a tag?

A
  • After the 1st person signs a tag the 2nd person IDEPENDENTLY verifies the correct position and location of all Tags; then signs and places TORS in the Active section
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Who is responsible for the administration of their cognizant tag-out log?

A

Authorizing Officer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

The work center supervisor can make pen and ink changes to which block on the MRC

A

Tools and materials

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is the purpose of a tag out audit?

A
  • To ensure active tags are hung in the correct location, position and inactive tags are not still in place
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Multi-monthly checks GREATER than annual will be accomplished within the interval of plus or minus _____ Quarter of the quarter specified by the periodicity interval.

A
  • 1
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Feedback Reports are submitted under what circumstances?

A
  • Maintenance requirements are not fully understood
  • Errors are believed to exist on the MRC
  • Entries in the TPMTE block are wrong or inadequate
  • Performance of the maintenance requirement would cause a hazardous condition to exist
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What are the different labels used in the Instrument Log and what colors are they?

A
  • OOC- Red
  • Out of Cal- Orange
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

How will the WCS implement the new force revision? 303.2.15
22

A
  • Apply changes to the WC PMS schedule utilizing SKED Revision Editor
  • Route revision changes to division LCPO for review and concurrence
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

How do you validate a piece of equipment?

A
  • use the Equipment Validation sheet and verify serial number, location, and name plate data.
  • Sign and update in OMMS-NG
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is SPMIG Category II

A

Materials

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

3M is divided into what two sub-systems?

A

PMS (SKED) and MDS (OMSS-NG)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is the purpose of the Instrument Log?

A
  • To control document for administering labels (OOC and CAL)
  • It provides sequential listing of all OOC and Cal instruments
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What periodicity is Q-1?

A

Quarterly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

What is IEM?

A
  • Inactive Equipment Maintenance
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Which category of IEM is accomplished when placing an equipment in IEM?

A
  • Lay-Up Maintenance
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

Monthly checks must be accomplished a minimum of _____ times per quarter.

A
  • 3
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

What are examples of Non-Technical FBRs

A
  • Split MIP
  • Shift PMS responsibility
  • MIP deletion
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

What periodicity is D-1?

A
  • Daily
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

What does MIP stand for?

A
  • Maintenance index page
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

What is the non-calendar periodicity code AP?

A

Assessment Procedure

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

What periodicity is M-2?

A
  • Monthly
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
What are the two types of FBRs?
Non-Technical Technical
26
Which symbol following a periodicity code indicates that the procedure is intended to be scheduled and performed by either Ship’s Force or Off-Ship Maintenance Personnel?
- ++
27
What is the LCPO’s role in implementing force revision?
- Verify that all PMS changes have been properly applied to the WC schedule utilizing SKED Revision Editor - Submit PMS schedule to the DIVO for review and concurrence
28
As a qualified maintenance person, what do you do upon completion of preventive maintenance?
- inform the WCS of completion or issues - Sign the accountability log if completed.
29
What is Status I IEM?
- Equipment not scheduled for corrective maintenance or overhaul - Equipment remain onboard - Will be inactive during extended period of time
30
When Daily (D) and Situational checks (R) are not accomplished they become _____ checks?
- Lost
31
What are you looking for when verifying MIP to LOEP?
- Make sure the MIP SYSCOM Control Number on the MIP matches what’s on the LOEP?
32
What is a JSN?
- Job Sequence Number - a four-digit number assigned by the work center to the maintenance action
33
What is safety chapter B6
Respiratory Protection
34
What is the HMUG?
Hazardous Materials Users Guide
35
What are the types of tags used in the tag out system and what colors are they?
- DANGER- Red - CAUTION- Yellow
36
What is a SPLIT MIP?
- A MIP that is SPLIT between two or more work centers due to sharing the same piece of equipment or system
37
What rank must a WCS have?
Must be an E-6 or above unless waived in writing by the XO
38
How long is 0.1 man-hours?
- 6 minutes
39
In the Space Manual, there is a page with a series of numbers like: 5000/005-A7. What is this page called and what are the series of numbers called?
- LOEP - SYSCOM MIP Control Number
40
Split MIPS are approved by whom?
- XO
41
Classified MRCs are printed on what color paper?
- Pink paper
42
List the sections of the Tag out Log.
- Tag-out Index - Record of Audits - TORSs (active and cleared) - Instrument Log
43
What is the non-calendar periodicity code SU?
Start-up
44
Who is responsible for ensuring 3M documents generated within the division are complete, accurate, promptly prepared, and submitted?
- Division Officer
45
What type of tags prohibits the operation or removal of equipment that could jeopardize safety of personnel or endanger equipment?
- Danger Tags
46
What are the steps to applying ORM?
1. Identify hazards 2. Assess hazards 3. Make risk decisions 4. Implement controls 5. Supervise
47
What symbol indicates a Safety of Ship item?
- *
48
What is the purpose of the Spot Checks?
- To validate that previously scheduled and accomplished MRCs were performed correctly
49
What does it mean if the SYSCOM Control Number at the bottom right of the MRC is shown with brackets [ ] around it?
Printed from PMS VIEWER tab and should not be used due to potential loss of custom line-outs
50
What does 3M stand for?
- Maintenance and Material Management
51
Who is responsible for reviewing the CSMP? How often?
- Division Officer, weekly
52
Who reviews MRCs and promptly submits a PMS TFBR, whenever maintenance requirements are not fully understood and errors exist?
Work Center Supervisor
53
Who is the command's 3MCM
EMCM Edjan
54
What actions do you take if you notice a hanging tag is missing, damaged or hanging from the wrong piece of equipment?
- Notify WCS, Authorizing Officer and WC responsible
55
Can you operate a valve that has a red tag on it that says the position is “Shut”?
- No
56
What is another name for the list of effective pages (LOEP)?
- PMS-5
57
Who is responsible for effective operation of 3M within their work center?
- LCPO
58
Where would you verify your MIP?
- Against the LOEP
59
Who is the command's 3MC (SKED - FBR, FR, SKED access)
GSMC Mak
60
What is the difference between OWC, ORG LVL & OUTSIDE ACTIVITY?
- OWC- Originating work center (self) - ORG LVL- Organizational level, (S/F WORK: A, E, R) - OA- Requesting Outside Activity, (IMA, DEPOT, FLEET TECH ASSIST, REGIONAL REPAIR CENTER)
61
What does the acronym LGL stand for?
- Location Guide List
62
What must happen when scheduled maintenance is not accomplished?
- A check note entry is annotated
63
Maintenance Action Form or Work Candidate is also known as:
- OPNAV 4790/2K
64
What is safety chapter B4
Hearing Conservation
65
What is the non-calendar periodicity code R?
Situational Requirements
66
Which symbol following a periodicity code indicates that the procedure is intended to be scheduled and performed by Off-Ship Maintenance Personnel?
- +
67
What is ORM?
- Operational Risk Management
68
A piece of equipment that will not be operated for at least how many days may be placed IEM?
- 7 Days
69
What is safety chapter B5
Sign Conservation
70
What is a LIRS?
- Line Items Record Sheet – necessary information required for isolating equipment for work including a list of required tags and verifying signatures
71
Under what tab in SKED do you generate reports from?
- Reports tab
72
When is equipment placed in IEM?
- When a piece of equipment or system is intentionally placed in a hibernated state for a specific period with the intention of reactivating that equipment or system at the end of the period
73
What manual covers all things Hazmat related?
NSTM 670
74
What does it mean when a PMS check is marked with the ‘¢’ symbol?
- Maintenance was accomplished by a Higher Level Maintenance or outside activity
75
What is Status II IEM?
- Equipment subject to corrective maintenance or removal for safe storage - Temporarily transferred to another activity for maintenance responsibility - When system or component are scheduled for replacement
76
What does the “Y” or N” in the MRC SYSCOM Control Number?
- Parts required or not required
77
What is the non-calendar periodicity code U?
Unscheduled Maintenance
78
If you discover inaccurate data on an MRC you should?
- Inform your WCS of the discrepancy - Submit a PMS Feedback Report
79
Which response best describes the work center PMS manual?
- Reflects that portion of the PMS Master file that is applicable to a particular work center.
80
Who will ensure PMS covers all equipment in the work center, and maintain an accurate and current LOEP by comparing documentation with actual equipment configuration?
WCS
81
What is the minimum required isolation for electrical systems?
- Requires only a single isolation point in each conductor path
82
If multiple maintenance persons are assigned to a single maintenance action who signs for the completion of the maintenance?
- The most senior maintenance person
83
What is the purpose of a Location guide list (LGL)?
- Used with a controlling MRC when the MRC applies to a number of identical pieces of equipment
84
What is the Authorizing Officers job relating to tag outs?
- The person with the authority to sign for issuing or clearing tags and labels
85
Who is the command's 3MC (OMMS-job update, review/screen/rejects jobs)
EMC Devinney
86
What symbol indicates a lost check?
- Circle
87
What symbol is used to mark a check complete?
- X
88
What information is required on the secondary container label?
- Material name - Manufacturer name and address - Nature of hazard including target organ
89
What does MRC stand for?
- Maintenance Requirement Card
90
What publication should be used by work center personnel to cross-reference the proper tools and materials for PMS?
SPMIG
91
What are the two categories of Technical Feedback reports?
- Urgent and Routine
92
What periodicity is W-1?
- Weekly
93
LU, SU, and PM PMS checks fall under what category of periodicity?
- IEM
94
What is a SDS?
Safety Data Sheet
95
Who will record all equipment deficiencies within their WC, utilizing OMMS-NG/P-OMMS to ensure all required 3-M System documents are submitted to the division LCPO?
WCS
96
Who Reviews and Approves the Quarterly Schedule?
- Department Head
97
What is safety chapter C8
Working over the side/aloft
98
Who determines the maintenance workload of their personnel for a given week or quarter utilizing the forecasting report?
Work Center Supervisor
99
What periodicity is 9M?
- Every 9th month
100
A Maintenance Person should notify the WCS when which situations occur?
- Any doubt exists about capability, training or experience to properly perform the maintenance requirement.
101
What does the “R” stand for in M-1R?
- Situation code
102
How do you validate an MRC?
- MRC – MIP – LOEP – Change Page
103
When is a maintenance requirement check circled?
- When a check is not fully accomplished
104
How often are tag out audits performed?
- every two weeks. - For ships that are in overhaul, conversion, or restricted availability, conduct audits of the propulsion plant tag-out log(s) weekly
105
What symbol indicates an N/A check?
- Circle with slash
106
The alphanumeric code 4FCD in the SYSCOM Control Number B4 4FCD Y stands for what?
- The Library Code
107
The alphanumeric code B9 in the SYSCOM Control Number B9 4FCD Y stands for what?
- A date code meaning November of 2019
108
When writing a new candidate, what do a red checks signify?
- Mandatory fields
109
How many days does HOD have to approve JSN?
- Seven days
110
Who conducts weekly close-outs?
- LCPO
111
What is SPMIG Category IV
Tools
112
What does CASREP stand for?
- Casualty report
113
When is the double-barrier isolation required for electrical systems?
- Breakers with remote operating capabilities shall be tagged both at the breaker and at all remote operating stations
114
What are maintenance requirements that must be accomplished concurrently with another maintenance requirement?
- Mandatory related maintenance
115
What is the FBR used for?
- Used to identify problems with the PMS documentation or to request the addition or deletion of PMS coverage
116
Who is the 3M Functional Manager?
- 3MC
117
Which block of the MRC, detailing a listing of those precautions and references, directs attention to hazards to personnel while doing maintenance?
- Safety Precaution
118
What does OMMS-NG stand for?
- Organizational Maintenance Management System- Next Generation
119
What is FBR?
- Feedback Reports
120
What does the letter “C” or “A” to the left of the MIPS on the LOEP indicate? .
- It indicates Change or Addition to MIP respectively
121
What are some common Global triggers?
- Deployment - Lighting off propulsion plant - Getting underway - Replenishment at sea - Fueling operations - Entering port - Mooring/anchoring
122
What code can be used to determine if portable electrical/ electrical test equipment models having the same test capability?
SCAT
123
What is the minimum Historical spot checks per week?
- One per DIVO, DCLPO, PA and HOD
124
What are the final steps for the WCS after the DH approve the force revision?
- WCS makes final entries in the WC Record of Change - Complete force revision package and submit to the LCPO for review and concurrence
125
Who can add and initiates a local trigger?
- Workcenter Supervisor
126
What is OMMS-NG used for?
Used for corrective maintenance
127
What is safety chapter B7/C9
Electrical/Electronic Safety
128
Who is responsible for effective operation of 3M within their department?
- Department Head
129
What special qualification must a WCS of 40 series work centers have?
DCPO and recommended by the DCA
130
An annual check interval is _____ days from last accomplishment.
- 364
131
How are IEM PM checks added to the weekly schedule?
- Manually by the Workcenter Supervisor
132
The WCS “cannot” substitute what?
- Specific or specialty tools called out by description
133
What program is used to conduct tag-outs and tag-out audits?
- eTAGOUT
134
What is “Gun decking”?
- Intentional Falsification of records
135
Who can initiate a FBR?
- Anyone in the chain of command
136
What is the local 3M instructions?
CVN70INST 4790.2J
137
What periodicity is 2W?
- Every 2nd week
138
Who is overall responsible for the 3M program?
- CO
139
What information is listed on an LGL?
- Name / nomenclature, Serial number, and Location
140
What is a procedural advisory on MRC called?
- Note
141
What is SPMIG Category III
Parts
142
What is the non-calendar periodicity code LU?
Lay -up
143
What system is used to track corrective maintenance (Jobs)?
- OMMS-NG
144
Configuration Change Form is also known as
- OPNAV 4790/CK
145
When must the LCPO review, approve and close out the previous week’s PMS schedule?
On the first work day of the following week (Monday)
146
Who is your D3MA?
FCC Ortega
147
Who conducts an oral board for 3M 301?
- D3MA
148
What does the periodicity code Q-9R mean?
- Once a quarter, or when required, whichever comes first
149
What is SPMIG Category V
Misc
150
What periodicity is 2M-1?
- Every 2nd month
151
The SPIN is used in conjunction with the_______ to validate tools, parts, and materials?
SPMIG
152
What is SPMIG Category I
Test Equipment
153
What kind of information does the HMUG contain?
- Control measures, precautions, PPE, and spill controls for HAZMAT
154
What is an electronic file that groups test equipment by function or capability?
SCAT
155
What is the meaning of SPMIG?
Standard PMS Materials Identification Guide
156
What symbol indicates mandatory related maintenance?
- #
157
When is the double-barrier isolation required for mechanical systems?
- High temperature 200 degrees F or more - High pressure 1000 psi or greater - All sea connected system except lines less than ½ inch inboard of the backup valves - All hull penetrations below the anticipated waterline - Fluids with flash point below 200 degree F - Oxygen - Hazardous toxic vapor
158
You are performing a maintenance action and cannot complete a step on the procedures, what if any is the most correct statement for reporting status of maintenance action?
- Stop the PMS and notify WCS for clarification
159
Semi-annual checks interval is _____ days following the last accomplishment
- 182
160
What is the number assigned to Tools, Parts, Material, and Test Equipment?
- SPIN
161
Who is the ship’s 3M Manager?
- XO
162
What is the purpose of the tag-out program?
- To provide personnel and ship safety and prevent damage to equipment - Prevent improper operation of an equipment - Provide special procedure prior to operating an equipment
163
What symbol indicates a checknote?
- Blue folder with a red cross
164
What is the purpose of the MRC?
- To provide step-by-step procedures to effectively perform PMS
165
A quarterly check interval is _____ days following the last accomplishment.
- 91
166
Supplemental Form is also known as:
- OPNAV 4790/2L
167
Who assigns zone inspectors within the department?
- D3MA
168
What is the 3M Manual?
- OPNAVINST 4790.4D
169
What do the last two numbers on the SYSCOM MIP control number represent?
- Month and Year MIP was prepared
170
Your division owns a vacuum cleaner. Personnel from another Division ask to use your vacuum cleaner to do PMS. What do you do?
- Do not allow them to use the vacuum cleaner
171
The alphanumeric number B4 4FCD Y is called what?
- MRC SYSCOM Control Number
172
What manual is used for Tag-out procedures?
TUM – Tag-out Users Manual
173
What are the four checks related to an equipment in IEM in order?
- LU, PM, OT, SU
174
What is the DIVO’s role in implementing force revision?
- Verify that all PMS changes have been properly applied to the WC schedule utilizing SKED Revision Editor - Submit PMS schedule to the DH for review and approval
175
What‘s in the force revision package?
- Force revision implementation checklist - SEER - Split MIP memo - FBR log - IEM memo - Missing Letter of Designation
176
How do you perform a tag out audit?
- Check all outstanding tags on each TORS for correct posting. - visually comparing the information on the tag, on the TORS, and on the posted component.
177
If a maintenance person identifies missing or damaged tags, who should be notified immediately?
- The Authorizing Officer
178
What system is used to schedule and track preventive maintenance (PMS)?
- SKED
179
What are you looking for when verifying LOEP to Change Page?
- Make sure “Date of Change” and the “Date Entered” match
180
What is DH’s role in implementing force revision?
- Verify that all PMS changes have been properly applied to the WC schedule utilizing SKED Revision Editor - Review and approve WC PMS schedule
181
What type of tag would be used as a precautionary measure to provide temporary special instruction or to indicate that unusual action must be exercised to operate equipment?
- Caution tag
182
What is the non-calendar periodicity code OT
Op test
183
What feedback report is used when it involves safety of personnel, ship or potential for damage to equipment and relates to the technical requirements of the card.
- Urgent
184
What are the two types of Maintenance actions?
Preventive and Corrective
185
A monthly check interval is _____ days following last accomplishment.
- 31
186
Which statement apply to damage to equipment, if not correctly followed?
- Caution
187
What must a JSN with a priority code other than DESIRABLE have?
- CASREP
188
What are examples of a Technical FBRs
- MIP changes - MRC changers - New Equipment - Equipment alteration
189
The statement “Damage to equipment may result if the operating procedures and practices are not correctly followed” is referred to as what?
- Caution
190
This display lists of all the maintenance actions that should be performed for a given week and shows all the equipment details, man-hour, crew assignment, and maintenance requirement description
- Schedule
191
What block details the sequence of steps to be followed in performing the maintenance action?
- Procedure
192
Which safety precaution applies to death or injury?
- Warning
193
What are maintenance requirements where all or part of the related MRC is performed when specific conditions are present or not met on the referencing MRC?
- Conditional related maintenance
194
When should the force revision implementation be completed by?
- On or before the first Monday of the new calendar quarter
195
Who is the command's 3MC (zone inspections, training, and testing)
- ETC Harris
196
To replace missing/mutilated MRC and LGL, what tab in SKED is provided solely for printing specific MRC’s?
- PMS Documents
197
Any maintenance action that should have been performed on any and every maintenance item and no matter the reason did not get scheduled is known as?
- Omitted maintenance
198
Display that provides a quick way for the to view FBR, PMS Alerts, Revision Approval, Metered checks and other items needing review, approval and acknowledgement
MY TASK/TASKS
199
Which category of IEM is accomplished when taking equipment out of IEM?
- Start-Up Maintenance
200
Who approves and finalizes the Review (cycle) schedules?
- Department Head
201
Which type of event can be triggered at the work center level in SKED?
- Local
202
What are you looking for when verifying MRC to MIP?
- Make sure the MRC and MIP SYSCOM Control Number on the MRC match what’s on the MIP
203
Which category of IEM is accomplished on a recurring basis during the inactive period to prevent equipment deterioration?
- Periodic Maintenance
204
Who is responsible for sustaining the shipboard 3-M program?
- 3MC
205
What periodicity is 2D?
- Every 2nd day
206
What periodicity is M-1?
- Monthly
207
What is safety chapter B12
PPE
208
Who is the command's CMO
LCDR Curry
209
Who is responsible for providing training to departmental personnel and managing departmental 3M qualification?
- D3MA
210
What is safety chapter B11
Tag-out
211
Which document contains information on HAZMAT’s physical data, melting point, boiling point, flash point, toxicity, health effects, and first aid?
SDS
212
Who reviews and approves FBR and how many days they have to accomplish?
- WCS – Day 1 - LCPO – Day 2 - DIVO – Day 3 - DH – Day 4 - 3MC – must export FBR within 7 days
213
Who is the command's 3MA?
OS2 Carcamo
214
Who assigns spot checks within the department?
- D3MA
215
On which PMS schedule would you find”2D” listed?
- Weekly
216
When PMS is marked as lost, not applicable, with the ‘¢’ symbol, or requires a tag-out in SKED what is required?
- Check note with amplifying information
217
Who reviews and acknowledges PMS alerts? 7
- Division Officer
218
What is the minimum SMA (Self-Monitored Assessment) per week?
- One SMA per Work Center per week - LCPO will conduct at least 1 Work Center per week - The rest can be delegated to any CPOs, PO1s or PO2 WCS’s Designated
219
How long is 1.1 man-hours?
- 1 hour and 6 minutes
220
The rate block of an MRC is the recommended skill level needed to complete those maintenance requirements.
- TRUE
221
Who is responsible for effective operation of 3M within their division?
Division Officer
222
What is safety chapter C1
Basic Safety
223
What periodicity is S?
- Semiannually
224
What are the 5 SPMIG categories?
- Category I – Test equipment - Category II – Materials - Category III – Parts - Catergory IV – Tools - Category V – Misc