3M- Workcenter Supervisor - QB1 Flashcards
(25 cards)
3M is divided into what two sub-systems?
PMS (SKED) and MDS (OMSS-NG)
What is SPMIG Category II
Materials
The work center supervisor can make pen and ink changes to which block on the MRC
Tools and materials
Who is responsible to review, approve and initial non-applicable procedural steps that are lined out?
LCPO
What is a LOEP?
List of Effective Pages; list all MIPS and applicable maintenance for that work center
What does MIP stand for?
- Maintenance index page
What is a Local trigger?
- A Local event that affects that particular piece of equipment which requires situational PMS to be accomplished
Who is responsible for the administration of their cognizant tag-out log?
- Authorizing Officer
When does the 2nd checker sign a tag?
- After the 1st person signs a tag the 2nd person IDEPENDENTLY verifies the correct position and location of all Tags; then signs and places TORS in the Active section
What is the purpose of the Instrument Log?
- To control document for administering labels (OOC and CAL)
- It provides sequential listing of all OOC and Cal instruments
What are the different labels used in the Instrument Log and what colors are they?
- OOC- Red
- Out of Cal- Orange
What is the purpose of a tag out audit?
- To ensure active tags are hung in the correct location, position and inactive tags are not still in place
What periodicity is D-1?
Daily
What periodicity is M-2?
Monthly
What periodicity is Q-1?
Quarterly
Monthly checks must be accomplished a minimum of _____ times per quarter.
3
Multi-monthly checks GREATER than annual will be accomplished within the interval of plus or minus _____ Quarter of the quarter specified by the periodicity interval.
1
What is the non-calendar periodicity code AP?
Assessment Procedure
What are the two types of FBRs?
Non-Technical
Technical
What are examples of Non-Technical FBRs
- Split MIP
- Shift PMS responsibility
- MIP deletion
Feedback Reports are submitted under what circumstances?
- Maintenance requirements are not fully understood
- Errors are believed to exist on the MRC
- Entries in the TPMTE block are wrong or inadequate
- Performance of the maintenance requirement would cause a hazardous condition to exist
What is IEM?
- Inactive Equipment Maintenance
Which category of IEM is accomplished when placing an equipment in IEM?
- Lay-Up Maintenance
How will the WCS implement the new force revision? 303.2.15
22
- Apply changes to the WC PMS schedule utilizing SKED Revision Editor
- Route revision changes to division LCPO for review and concurrence