3M- Workcenter Supervisor - QB2 Flashcards
(25 cards)
What does 3M stand for?
- Maintenance and Material Management
What is the HMUG?
Hazardous Materials Users Guide
As a qualified maintenance person, what do you do upon completion of preventive maintenance?
- inform the WCS of completion or issues
- Sign the accountability log if completed.
What rank must a WCS have?
Must be an E-6 or above unless waived in writing by the XO
Who is responsible for ensuring 3M documents generated within the division are complete, accurate, promptly prepared, and submitted?
- Division Officer
In the Space Manual, there is a page with a series of numbers like: 5000/005-A7. What is this page called and what are the series of numbers called?
- LOEP
- SYSCOM MIP Control Number
What is a SPLIT MIP?
- A MIP that is SPLIT between two or more work centers due to sharing the same piece of equipment or system
Split MIPS are approved by whom?
XO
Classified MRCs are printed on what color paper?
- Pink paper
What are you looking for when verifying MIP to LOEP?
- Make sure the MIP SYSCOM Control Number on the MIP matches what’s on the LOEP
How long is 0.1 man-hours?
- 6 minutes
What does it mean if the SYSCOM Control Number at the bottom right of the MRC is shown with brackets [ ] around it?
Printed from PMS VIEWER tab and should not be used due to potential loss of custom line-outs
What are the steps to applying ORM?
- Identify hazards
- Assess hazards
- Make risk decisions
- Implement controls
- Supervise
What is safety chapter B6
Respiratory Protection
What are the types of tags used in the tag out system and what colors are they?
- DANGER- Red
- CAUTION- Yellow
What type of tags prohibits the operation or removal of equipment that could jeopardize safety of personnel or endanger equipment?
- Danger Tags
List the sections of the Tag out Log.
- Tag-out Index
- Record of Audits
- TORSs (active and cleared)
- Instrument Log
What symbol indicates a Safety of Ship item?
*
Which symbol following a periodicity code indicates that the procedure is intended to be scheduled and performed by either Ship’s Force or Off-Ship Maintenance Personnel?
++
When Daily (D) and Situational checks (R) are not accomplished they become _____ checks?
Lost
What is the non-calendar periodicity code SU?
Start-up
What is Status I IEM?
- Equipment not scheduled for corrective maintenance or overhaul
- Equipment remain onboard
- Will be inactive during extended period of time
What is the purpose of the Spot Checks?
- To validate that previously scheduled and accomplished MRCs were performed correctly
What is the LCPO’s role in implementing force revision?
- Verify that all PMS changes have been properly applied to the WC schedule utilizing SKED Revision Editor
- Submit PMS schedule to the DIVO for review and concurrence