3M- Workcenter Supervisor - QB5 Flashcards
(30 cards)
What is SPMIG Category IV
Tools
What code can be used to determine if portable electrical/ electrical test equipment models having the same test capability?
SCAT
What special qualification must a WCS of 40 series work centers have?
DCPO and recommended by the DCA
Who conducts weekly close-outs?
LCPO
Who is responsible for effective operation of 3M within their department?
Department Head
Who is the 3M Functional Manager?
3MC
What does the letter “C” or “A” to the left of the MIPS on the LOEP indicate?
.
- It indicates Change or Addition to MIP respectively
How do you validate an MRC?
- MRC – MIP – LOEP – Change Page
The alphanumeric code B9 in the SYSCOM Control Number B9 4FCD Y stands for what?
- A date code meaning November of 2019
The alphanumeric code 4FCD in the SYSCOM Control Number B4 4FCD Y stands for what?
The Library Code
Which block of the MRC, detailing a listing of those precautions and references, directs attention to hazards to personnel while doing maintenance?
Safety Precaution
What are maintenance requirements that must be accomplished concurrently with another maintenance requirement?
Mandatory related maintenance
Who can add and initiates a local trigger?
Workcenter Supervisor
What are some common Global triggers?
- Deployment
- Lighting off propulsion plant
- Getting underway
- Replenishment at sea
- Fueling operations
- Entering port
- Mooring/anchoring
What is safety chapter B7/C9
Electrical/Electronic Safety
When is the double-barrier isolation required for electrical systems?
- Breakers with remote operating capabilities shall be tagged both at the breaker and at all remote operating stations
How often are tag out audits performed?
- every two weeks.
- For ships that are in overhaul, conversion, or restricted availability, conduct audits of the propulsion plant tag-out log(s) weekly
What symbol indicates an N/A check?
Circle with slash
When is a maintenance requirement check circled?
- When a check is not fully accomplished
What does the “R” stand for in M-1R?
Situation code
An annual check interval is _____ days from last accomplishment.
364
What is FBR?
Feedback Reports
What is the FBR used for?
- Used to identify problems with the PMS documentation or to request the addition or deletion of PMS coverage
What is the minimum Historical spot checks per week?
One per DIVO, DCLPO, PA and HOD