Chapter 4 Flashcards

(37 cards)

1
Q

Alternative paths within foodservice operations that food and menu items may follow, beginning with receiving and ending with service to customer is

A

Food product flow

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Conventional or traditional
ready prepared
commissary
assembly/serve are four types of

A

foodservice operations

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Foods are purchased in different stages of preparation for an individual operation, and production, distribution, and service are completed on the same premises is ______
examples are butcher, bake shop, and vegetable prep unit

A

Conventional food service

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Plates or trays are assembled in area close to production is ______
examples are hospitals and healthcare service

A

Centralized service

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Food is transported in bulk to a location separate form production and plates or trays of food are assembled in that location is _____
example gallery

A

Decentralized service

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Menu items are produced and held chilled or frozen until heated for service is ______
examples are

A

Ready prepared food service

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Method in which menu items are partially cooked, rapidly chilled, held in chilled storage, and reheated just prior to service is ____
<10% usage

A

Cook-chill

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Method in which menu items are partially cooked, rapidly frozen, held in freezer storage and reheated just prior to service is _____
stored from 2 weeks to 3 months

A

Cook-freeze

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

A process of sealing raw, fresh food items in plaster pouches to allow chilled storage and then cooking in boiling water to preserve is _____

A

Sous Vide aka under vacuum

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Centralized procurement and production facilities with distribution of prepared menu items to several remote areas for final prep and service is ______

A

commissary foodservice

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Menu items are purchased prepared and require minimal cooking before service is _____

A

assebly/serve

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Defining the size, shape, style, and decoration of a space is

A

design

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

what refers to the detailed arrangement of the equipment, floor space, and counter space?

A

layout

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

movement of product or people through an operation is the ____

A

flow

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

the movement of food from receiving through production to the customer and then through ware washing and trash removal is ____

A

product flow

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

the movement of employees through the operation as they complete their work is

17
Q

Collaborative planning session is

18
Q

What defines spaces in the planned kitchen and the relationship of these spaces to each other?

A

bubble diagram

19
Q

what states goals for the project, gives an overview of the occupants of the planed space, presents a projected timeline for the project, proses allocation of space to the desired units/activities within the planned space, and details guideline to be followed in the actual design phase……

20
Q

Preliminary plans for the project, space drawings, proposed materials, electrical and mechanical issues, and projected costs is

A

schematic design

21
Q

What provides specifications and often cut sheets for all of the equipment planned for the space?

A

Specification book

22
Q

layout design aka

23
Q

documents that provides blueprint layout of the space and more detailed elevations and graphic drawings to help clearly convey to the contractor the proposed plans for the facility

A

construction documents

24
Q

lighting aimed at a certain place

A

direct lighting

25
lighting shining over a space rather than a certain place
indirect lighting
26
amount of light generated when 1 foot candle of light shine from a source
lumen
27
measurement of illumination equal to 1 lumen of light on 1 square foot of space
foot candle
28
What light generates by passing an electric arc through a tube mixed with special gases
electric discharge light
29
What indicates the effect of a light source on the color of objects based on a 0-100 scale?
CRI color rendering index
30
measure of the coolness (red, orange) to warmness (blue-white) appearance of a light is
CCT correlated color temp
31
measure of how efficiently a light source uses power is
PF power factor
32
common light bulb
incandescent lights
33
LED light emitting diodes lights
movement of eltrons across a semin conductor material to generate light
34
the circulation of fresh air in a space
ventilation
35
occurs when more air is removed from space than brought in
negative air pressure
36
occurs when more air is brought into spar than is removed
positive air pressure
37
the weight of the material per square foot
guage