Construction and Technology and Environmental Services Level 3 Flashcards
(16 cards)
Tell me about the impact of different design solutions and construction processes on cost and programme.
Tell me about your advice on the selection and application of particular processes within your area of experience.
How have you liaised with specialists and consultants to develop project specific design and construction solutions?
Talk me through how you have reported on the impact of different design solutions on cost of a construction project.
Talk me through how when you have reported on the impact of different design solutions and construction processes on programme.
Talk me through when you’ve advised on the choice of construction solutions for your project.
Talk me through when you have advised of potential programme reduction in respect the construction of a work package or activity.
Talk me through a value engineering you’ve carried out during a construction project.
How have you advised on design where the methods of construction or materials have had a significant impact on project cost?
How have you considered practical alternatives to those specified by the professional team?
LS Project - What was the cause of overspend on your project?
LS - What did your client mean by ‘increase the financial viability’?
LS - How did the carbon objectives impact the project financial viability?
LS - What did you report was the impact of the proposed concrete ring beam construction methodology to the financial viability of the scheme?
Hazella Project - What was the advice you provided on the two options for basement size for this project?
Hazella - What considerations did you make when advising on cost efficiency?