Weld Procedure (IX: Various)

WPS

2

Qualification Record of a Weld Procedure (IX: Various)

PQR

3

Welders Qualification Record (welder's paper) (IX: Various)

WPQ

4

Document that must be prepared and maintained for each vessel and relief device (510: 5.1)

Inspection Plan

5

Manual that must be prepared and maintained by each Owner/User that uses API 510 (510: 4.2.1)

QA Inspection/ Repair Manual

6

Two documents that are needed by each Repair Organization that repairs relief devices (510: 6.6.1.1/2)

QC Manual & Training

7

Design pressures within scope of ASME Section VIII & API 510 (VIII: U-1.c.2.h.1 & 510: App A b.8)

> or = to 15 psig

8

Design pressures of non-fired boilers (waste heat boilers) that require Full RT (VIII: UW-11.a.3)

> or = to 50 psig

9

Minimum range of pressure gauge used during a test (VIII: UG-102.b)

1.5 X P test

10

Preferred range of pressure gauge used during a test (VIII: UG-102.b)

2.0 X P test

11

Maximum range of pressure gauge used during a test (VIII: UG-102.b)

4.0 X P test

12

Material subject to temper-embrittlement (510: 3.59)

Low Chromes

13

Materials subject to chloride stress-corrosion cracking (571: 4.5.1.1)

300 Stainless Steel

14

Material subject to polytheonic acid stress-corrosion cracking (572: 9.4.1)

300 Stainless Steel

15

Common material with an endurance limit (fatigue cracking cannot occur below this stress level (571: 4.2.16.3.b.i)

Carbon Steel

16

Common material without an endurance limit (571: 4.2.16.3.b.ii)

Stainless Steel

17

P-numbers allowed to use pre-heat in leiu of PWHT (510: 8.1.6.4.2.2.1.a)

P1 & P3

18

P-numbers allowed to use controlled deposition in lieu of PWHT (510: 8.1.6.4.2.3.b)

P1, P3 & P4

19

Manual that must be prepared and maintained by each vessel and relief device

QA Insp/ Repair Manual

19

P-numbers of base metal that should be examined for delayed cracking after repairs to SS cladding (510: 8.1.5.4.4)

P3, P4 & P5

20

Design pressure within scope of ASME SECT VIII & API 510

>= 15