DPWH MANUAL (EARTHWORKS) Flashcards

(7 cards)

1
Q

Wherever the existing ground is above the constructed section, the construction is said to involve?

A

Cut or excavation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Wherever the existing ground is below the constructed section, the construction is said to involve?

A

Fill or embankment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The points at which the cut or fill slopes intersect the existing ground are referred to as?

A

Catch points

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The points at which the cut or fill slopes intersect the nearly horizontal roadway surface are referred to as?

A

Hinge points

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

A graph of cumulative volume of earthwork versus distance in stations from the beginning of the job, in which cut is considered to be positive and fill negative.

A

Mass diagram

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

The product of a volume of material times the average distance it is hauled is referred to as?

A

Haul

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The longest distance material should ever be hauled is called the?

A

Limit of economic haul

How well did you know this?
1
Not at all
2
3
4
5
Perfectly