E-1 Major Action Categories
1) Monitor Plant systems for optimal operation
2) Check for subsequent failures
3) Determine optimal recovery procedure
E-1 FOP
RWST <30% CST CR Press Fan RCP Trip - 1300# W/ CCP or SI in serv or Phase B E-2 E-3 SI reinitation - 40F sc or <16% PRZ RHR restart RCS <300# Sump Blockage ECA 1.3
E-1 When and why do we transition to HL recirc?
7 hours due to Boron plating which reduces heat transfer
E-1 What are the LOCA phases?
Blowdown
Refill (LBLOCA Only)
Reflood
Long term recirc
E-1 Why is a cold leg LOCA the most impactful?
Cross under loop creates loop seal therefore, energy cannot be removed. Pressure rises and core level loweres in the vessel.
On natural circ - Tcold will be colder than with an RCP running. Colder = more dense = more mass loss
What differentiate a Small vs LBLOCA?
Leak
Within Charging system capability
SMBLOCA:
3/8” diameter (UFSAR)
No RHR
Charging cannot maintain
LBLOCA:
1’ diameter (UFSAR)
RHR Flow >400gpm and RCS P < RHR (EOP)
Cold Leg recirc TCA
5 min - swap to cold leg recirc
5 min - CTS to recirc sump
15 min after cold leg recirc - adjust CCW to RHR to 5000g prevent runout if pump fails
Spray TCA
50/70hr place RHR Spray I/s (50 - ensure core heat removal 70 protect cnmt)
6-22hr H2 recombines (6 cnmt heat / 22 cnmt pressure)
24 hr - CTS / RHR Spray needs to be I/s for CR dose
Hot Leg recirc TCA
5.5 - 7.5hr / hot leg for boron plating
15 min - align 1 CCP to HL recirc
SI TCA
90 min start and monitor PACHMS
LOOP + LOCA TCA
6 hr start CCW fans
What are accumulator limits and why?
Level 921ft - 971ft - low lvl not enough to cover to core mid-plane / hi not enough N2 to inject
Pressure - Low no inject into RCS / Hi to much will dump
Accum outlet valves closed RCS < 150 - prevent N2 from injecting
What are the 10CFR5046 Criteria?
PCT 2200F 17% Localized Cladding Oxidation 1% H2 concentration Coolable Geometry Long term cooling
What is an indication of a PRZ steam space leak?
Prz level will rise
What are the methods of heat RCS heat removal during a LOCA?
ECCS Flow and Break Flow
AFW / SG
What are the indications of a LOCA?
RCS P, PRZ lvl SG press lower
CNMT P, CNMT Sump, CNMT Rad
E-1 What is the purpose of Step 9 loop?
Ensure in correct procedure. If SG P is lowering or RCS P rising go to step 1 and Check for faulted SG that is still blowing down. When SG is done blowing down E-1 Si termination criteria will be met which are less restrictive than ES1.2 criteria (if you continue past step 9)
If in E-1 and RCS P is >300# where will you go?
ES1.2 post LOCA cool down
If in E-1 and RCS P <300# where will you go?
ES 1.3 then back to E-1