{ "@context": "https://schema.org", "@type": "Organization", "name": "Brainscape", "url": "https://www.brainscape.com/", "logo": "https://www.brainscape.com/pks/images/cms/public-views/shared/Brainscape-logo-c4e172b280b4616f7fda.svg", "sameAs": [ "https://www.facebook.com/Brainscape", "https://x.com/brainscape", "https://www.linkedin.com/company/brainscape", "https://www.instagram.com/brainscape/", "https://www.tiktok.com/@brainscapeu", "https://www.pinterest.com/brainscape/", "https://www.youtube.com/@BrainscapeNY" ], "contactPoint": { "@type": "ContactPoint", "telephone": "(929) 334-4005", "contactType": "customer service", "availableLanguage": ["English"] }, "founder": { "@type": "Person", "name": "Andrew Cohen" }, "description": "Brainscape’s spaced repetition system is proven to DOUBLE learning results! Find, make, and study flashcards online or in our mobile app. Serious learners only.", "address": { "@type": "PostalAddress", "streetAddress": "159 W 25th St, Ste 517", "addressLocality": "New York", "addressRegion": "NY", "postalCode": "10001", "addressCountry": "USA" } }

Student Guide Rules of Usage Flashcards

(7 cards)

1
Q

When are EOP applicable?

A

Mode 1-2 Rx trip
Mode 1-3 SI
Mode 1-4 ECA0.0

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What EOPs have immediate actions?

A

E-0
FRS.1
ECA0.0

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is adverse cnmt?

A
  • Cnmt P > 5#s
  • Dose Rate > 100,000 R/hr exited when verified < 1 mill R
  • ELAP until PRZ and SG compartment < 196.8
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What are the CSF?

A
  1. Subcriticality
  2. Core Cooling
  3. Heat Sink
  4. Integrity
  5. Containment
  6. Inventory
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

When can we enter ES 0.0?

A

In E series procedure, SI has occurred or is required, E-0 completed, and correct procedure unknown

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What are the two prudent operator actions listed in OHI-4023?

A

Trip closed SGSV

De-energize electrical bus

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What was the cutoff event frequency, in events per reactor year, for inclusion in the EOP network of procedures?

A

10^-8 events / rx year

How well did you know this?
1
Not at all
2
3
4
5
Perfectly