OMA Flashcards
(7 cards)
APU usage policy
Start no earlier than 15 min before departure.
Shutdown APU within 5mins of arrival.
APU standard usage policy exceptions.
Avg temp is 26° or more
Avg temp is 14° or less
No PCA and turnaround time is less than 70mins.
777 only one GPU available. APU may be started at STD-60min if electrical load shedding will affect preflight.
When do you need a Takeoff Alternate?
When TO weather conditions at the departure aérodrome are below the landing minima for that aérodrome.
OMA 8.1.3.2.2
What are the requirements for a takeoff alternate aerodrome?
1) filed on flight plan
2) forecast WX is above landing minima for that approach
Ie. RVR / Vis is above minima AND for NPA, ceiling is at or above MDA
- LVO minima may be used
OMA 8.1.3.3.2
When do we need 2 destination alternates?
When WX forecasts at destination indicate weather below applicable minima.
OR
No meteorological info is available
What are the requirements when 2 destination alternates are required?
1) WX forecast at both destination alternate is at or above Planning minima for Destination Alternate Aérodromes
-> Table A 8.1.3.3.4
2) Fuel to divert to the further one.
3) both destination alternates filed on OFP and ATS flight plan
What are the Planning Minimas for Destination Alternate airport?
Table A: not USA/Canada
CAT II and CAT III
-> CAT 1 RVR
CAT 1 and APV APP
-> NPA RVR / VIS
-> Ceiling at or above MDH
NPA
-> NPA RVR / VIS + 1000m
-> ceiling at or above MDH +200