Resource Management Flashcards Preview

ARE 5.0 - Project Management > Resource Management > Flashcards

Flashcards in Resource Management Deck (27)
Loading flashcards...
1

What are four criteria typically considered when assembling a project team?

- experience
- availability
- billing rate
- personality

2

What is the primary criterion for consultant selection? Secondary?

Primary = past working relationship.
Secondary = fee proposal and firm expertise.

3

Allocation of project resources within an office is dependent on...

... Owner preferences for staff selection and the firm's organizational structure.

4

What is the primary role of the project manager?

Coordinate all design and construction administration activities.

5

EPA

Environmental Protection Agency

6

FEMA

Federal Emergency Management Agency

7

OSHA

Occupational Safety and Health Administration

8

AHJ

Authority having jurisdiction

9

ANSI

American National Standards Institute

10

ASHRAE

American Society of Heating, Refrigeration and Air Conditioning Engineers

11

ASTM

American Society for Testing and Materials.

12

ICC

International Code Council

13

IEBC

International Existing Building Code

14

IECC

International Energy Conservation Code

15

IFC

International Fire Code

16

IMC

International Mechanical Code

17

IPC

International Plumbing Code

18

NEC

National Electrical Code

19

NFPA

National Fire Protection Association

20

SMACNA

Sheet Metal & Air Conditioning Contractors' National Association

21

ASHRAE 90.1

A standard that provides minimum requirements for the energy-efficient design of buildings, except for low-rise residential buildings.

22

AGC

Associated General Contractors of America

23

EJCDC

Engineers Joint Contract Documents Committee

24

Authority having jurisdiction

The governing body carrying the requirements and codes by which the project must adhere.

25

NIOSH

National Institute for Occupational Safety and Health

26

Who are the three participants, at minimum, that are involved in a project team?

owner, architect, and consultant

27

What team member is added to the project team if minimizing sound transmission is included in the scope of the work?

Acoustical engineer