Summary Flashcards

1
Q

Titchfield Road

A

Level 2 ethics - vendor requested information within the report

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Sandpipers

A

Level 2 ethics- fee proposal for a garage block ca

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Sussex Road

A

Level 3 ethics- client want me to exaggerate roof repair and dampness

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Wilberforce

A

Level3 ethics- party wall AO appointed surveyor Agreed surveyor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Marmion Road

A

Level2 client care - Portsmouth on a morrass

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Ashwood garden

A

Level2 client care - complaint slippage of dpc

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Tower house

A

Level 2 com and neg- AGM 60 residents

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

The gregg school

A

Level 2 com and neg- weekend working for school redec

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Freshwater court lintel repairs

A

H&S level 2 - asbestos in ceiling - r&d non licenced works course

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Wood grange

A

Woodgrange
cost for access
seemed low. I discovered they had opted for access by means of mobile
tower. I did not consider this to be suitable for the works to be
undertaken safely and requested they provide a cost to supply
scaffolding in accordance with TG20:21.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Hamilton

A

Level 2 design and specifications – Water ingress
I developed a specification to address issues related to water ingress
and condensation in the communal areas of the building. My proposal
included the replacement of the leaking skylight located within the loft
space, as well as necessary repairs to the valley gutter. Additionally, the
loft space was found to be inadequately insulated, with open water
tanks contributing to elevated levels of condensation. I consulted the
Building Regulations and recommended enhancements to the
insulation, installing lids on the water tanks and implemented
ventilation measures.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Fareham Road

A

Level 2 design and specifications–
The client wanted to alter the ground floor layout to include a utility
room. I attended site to establish the client’s brief. I took detailed notes,
measurements and sketches and produced two design options for an
alternative kitchen, utility and bathroom layout based on the existing
service and drainage and without the need for structural alterations. I
researched spacial parameters to ensure my designs would be a
functional, usable space

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Marine Parade - Feasibility study

A

Level 3 design and specifications-
Render versus decoration

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Seaview court

A

Level 3 design and specifications- Phenophelene testing leading edges, flexcrete repair monodex ainti carb paint

Traditional route control over the quality

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Tower house terrace repair

A

Level 2 contract practice-

Loi as the flat owner was on holiday and there were items outstanding including the replacement doors and pavers.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Aldershot road

A

Level 2 contract practice-

Jct minor works contract completed

17
Q

Orchard Road – Window repairs

A

Level 2 conservation - window repairs and redecoration

18
Q

Quarry house

A

Level 2 conservation- lath and plaster detached

Cavity wall insulation no no no

19
Q

Northfield House – Alteration and refurbishment

A

Level 2 works progress- site inspection reports

20
Q

Delme 3 - Refurbishment

21
Q

Swan Court – PPM

A

Level 3 legal - fire doors not functioning,

Asbestos management plan not updated to reflect the current layout

22
Q

Flower Buildings – External repairs

A

Level 3 legal - replace e plastic store fronts and plastic rainwater goods

Store required planning so was left out of the project

23
Q

Northfields House - Refurbishment

A

Legal 3 legal - compartmentation
Changed colours

24
Q

Virginia Park Road

A

Level 2 legal - extension and loft conversion

104b

25