ASME SECTION V Q&A Flashcards
(90 cards)
A filmside IQI can be used for:
inaccessible welds ( unable to hand place a source IQI)
A dark image of the “B” on a lighter background is _______________
Acceptable
One of the procedural requirements for conducting PT is to address the processing details for
A. Post-examination cleaning
B. Pre-examination cleaning
C. Apply the penetrant
D. All of the above
Non-aqueous developer shall be applied to a _____________.
dry surface
The accuracy of a piece of magnetizing equipment that is equipped with an ammeter shall be
verified______________________.
each year
A wire IQI shall be placed ___________ the weld, with the wires _________ to the weld
only perpindicular
A field indicator is composed of ________ low carbon steel pie sections, furnace brazed together.
8
The magnetizing current must be identified on the written MT procedure.
type,amperage
Certification of contaminants shall be obtained for all PT materials used on ___________.
austenitic stainless steels
Black light intensity shall be measured with a ______________when conducting fluorescent PT
black light meter
When should a densitometer be calibrated as a minimum?
every 90 days
The location markers required by ASME V are required __________________.
appear as radiographic images
When using fluorescent penetrant, the examiner shall be in a darkened area for at least ______
minutes prior to performing the examination.
5
D.C. yokes may be used for detecting _________________discontinuities, per ASME V?
surface
When coatings are applied to enhance contrast, the procedure must be demonstrated that
indications ______________________.
Can be detected through the coating
How many total liquid penetrant techniques are listed in ASME V?
6
Prior to examination, each adjacent surface shall be cleaned within at least ______” of the area
to be examined.
1’’
Water washable penetrant shall be removed with a water spray not exceeding _____ and _____.
50 psi,110f
Densitometers shall be calibrated by verification with a calibrated______________.
Step Wedge Film
When using a hydrophilic emulsifier versus a lipophilic emulsifier and intermediate step that must be
taken is:
pre-rinsing with water
When a PT test cannot be conducted between 50° - 125°F, what must be done, per ASME V?
The procedure must be qualified.
The double wall viewing technique is limited to what sizes?
3.5” OD or less.
All PT indications are to be evaluated in accordance with_____________________.
The referencing Code section
The scope of the ASME Boiler and Pressure Vessel Code, Section V includes:
How to perform NDE to achieve a desired result