Power Check
50 Knots straight & Level Check MIL reading
Landing IGE Hover
+35% Power Required
Landing OGE Hover
+40% Power Required
Landing Steep Approach
+45% Power Required
Low Operation Take Off
+35% Power Required
Normal take off and up to 25 Feet Vertical
+40% Power Required
50 feet take off
+45% Power Required
P.S.W.A.T.C
Power Check, Permission, Payload 5 S’s (Size/Shape/Slope/Surface/Sun/Surrounds) Wind / Wires / Way-out Approach / Abort Point Termination Point / Take-off Circuit
TEM