Q

What are the storage water planning factors required during contingencies?

A

5-day supply of water
60% potable
30 GPPD

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are the capabilities of a ROWPU kit?

A

2 ROWPUs/Kit
Can operate 20 hours/day; 4 hours for backwash and maintenance
1:1 product:reject ratio
1500 gph

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Explain the 5 day storage requirement

A

60% of water is potable; 40% is non-potable

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What are the design considerations?

A

water source, population, threat conditions, topography, weather, duration

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Source Run Subsystem (SRS)

A

Source to treatment: Floor assembly/strainer, Diesel Pump, collapsible fabric tank

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Water Production System (WPS)

A

Treatment Plant: Strainer+floor assembly, Diesel Pump, Electric Pump Assembly, 20,000 gallon fabric tanks, ROWPU, 3000 gallon collapsible fabric tank

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

550 Initial Subsystem

A

Distribution for 550 personnel: Diesel pump, 20,000 gallon tank, dual pumping station, 3000 gallon collapsible fabric tank, bladder water level controllers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

550 follow on subsystem

A

Adds distribution for 550 personnel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Flightline extension

A

Extension to flightline from WPS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

How much of potable water at a base will become wastewater?

A

70%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What is the water treatment and distribution time?

A

D+10 days to lay water lines, develop water and waste program

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Personnel:Toilet Ratio?

A

1 toilet serves 20 people

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What are the basic siting requirements for wastewater tanks?

A

100 yards from nearest dining facility; 100 feet from nearest water source; septic tank must be >400’ from leaching field

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is the wastewater generated/person before and after BEAR assets?

A

Initial: 15 GPPPD
BEAR: 21 GPPPD

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What are the important separation distances? (hint - 4)

A
  1. Facility to macerator pump - 100 feet
  2. Macerator pump to dual pump lift station - 500 feet
  3. Dual pump lift station to wastewater tank - 100 feet
  4. Total distance facility to wastewater tank - 700 feet
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

550-initial subsystem (wastewater)

A

Sewage ejector systems, macerator pump lift station. dual pump lift station, 25000 gallon wastewater collection tank with mixing systems

17
Q

550-follow subsystem

A

Sewage ejector system, sewage ejector lift station, macerator pump lift station

18
Q

Evaporation Lagoon

A

Can’t use in PACAF lmao; net evaporation rate of 46in/year

19
Q

Septic Tanks/Leach Field

A

solids settle to the bottom, effluent dispersed into drain field; <1000 - 15000 gpd; cleaned every 1-3 years

20
Q

Package Plants

A

Modular or package form of sewage treatment plants; primary and secondary treatment

21
Q

Conventional Treatment Plant

A

Most preferred treatment method; highest cost

22
Q

Benefits of reducing water demand

A

less competition with local community; save money/resources/energy; reduce base vulnerability