For a LCLOCA what is the assumed failure and why?
- has adverse impact on core re-flood
For a LBLOCA, what is the Design SI Flow Assumptions?
For a SBLOCA what is the assumed failure?
What is the design criteria for ECCS?
During a SBLOCA what is credited for the RCS Heat Removal Safety Function management?
SBLOCA
LBLOCA
When is an RCS cooldown performed following a LOCA?
During a LOCA, what is the purpose of CS?
For Decrease in Inventory TAA, what is the assumed failure for a LD line break outside of CTMT?
CHB-515 does NOT auto close on High RHX outlet temperature
How long do you have to isolate a LD leak outside of CTMT?
What are the 5 phases of mass energy release during a LOCA?
Blowdown Phase - Initial leak, cladding cooled by leakage
Refill phase - Refilling core downcomer, not fuel cladding heats up
Re-flood phase - SITS refill core cladding begins cooling
Post Re-flood phase - Total core coverage with HPSI/LPSI
Long Term period - Restores CTMT press.