First saw to the roof of a 2 story flat roof PD
2nd roof (first roof bring LSR if a delay in laddering the building)
are pole mounted con ed transformers pcb filled
no they are mineral oil transformers but some are PCB contaminated (50-499 ppm PCB)
at HRFPMD who ensures elevators are recalled
2nd arriving truck
for hurricane and storm preparedness all members shall be reminded of Reception areas each year on or about
may 1st
what are the “core competencies” of the FDNY
Fire suppression, pre hospital emergency medical care, search and rescue, structural evac, CBRN/Haz mat life safety ops and mass decon, arson investigation (cause and origin
after what year was core construction techniques used extensively
after 1968 in class E high rise office buildings
a challenge situation at active shooter consists of identifying yourself as an FDNY member and what esle
rank and name
multiversal do not operate more than______gpm
800gpm
1 1/4 tip on multiversal do not exceed_____psi
100 psi
1 1/2 tip on multiversal do not exceed______psi
70 psi2
2 inch tip on multiversal do not exceed_______psi
50 psi
underground chemical attack 2nd ladder team 2
site access control
undergound chemical attack 2nd ladder team 1
evacuation to gross decon
underground chemical attack 1st ladder team 2
backup for team 1
underground chemcial attack 1st ladder team 1
evacuation and hazard assessment
bowstring truss roofs may only support how much of the load they were designed for
40 percent
who handles conflicts of interest Bits or IG
Bits
IG responsibilities include
corruption, criminal, serious confrontations with civilians
Lobby control unit operates on what channel
tactical
portable ladders are marked with the unit designation where?
18 inches of butt
portable ladders are marked with the length of the ladder where
within twelve inches from the end of the ladder, straight ladders on both sides, extension on the butt side
most effective means of communication between TL basket and pedestal
intercom
when do units inspect spare cylinders for full pressure(4500 psi)
weekly on mondays
when requesting an ambulance what info must companies relay to the dispatcher
Pulse, age, respiratory rate, CUPS status, chief complaint and if CPR is initiated