Understanding Work Breakdown Structure

After you go ahead to start your project, the first thing you do is to ____ that has to be done

identify the work

1

Is a tool you use to breakdown the project into bite-size pieces so you can plan, track, and manage your project efficiently

WBS or Work Breakdown Schedule

2

It is easier to estimate ____ and ____ for small chunks of work

time and cost

3

It is easier to assign ___ to team members

work

4

By breaking up work into smaller pieces, you build checkpoints that allows you to measure ___

progress

5

WBS contains two kinds of task:

1. Summary Tasks
2. Work Packages

6

____are a higher level task that summarize project work. It can describe the process of each work

Summary Task

7

The number of levels of summary depends on the ____ of the project

size

8

____are the lowest level task that spare out the detail that needs to be done

Work Packages