11 Flashcards

(113 cards)

1
Q

1:01 PM Sat May 31

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

GE Reviewer

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

..•

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

22% •

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Openin Word U Q =i @ Done

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

10 centimeters diameter and 50 centimeters in length

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The secondary control station shall be defined by concrete

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

monuments of not less than

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Height of instrument

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Is the vertical distance from the station occupied to the

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

horizontal axis of the transit in mine survey

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

35 stations

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Number of stations between azimuth checks in secondary

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

control traverse by astronomical observation

A

not to exceed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Rear chainman

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

In a primary control

A

horizontal distance measured shall be

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

read and recorded

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

A rod reading on a point with known elevation

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

Back sight in levelling is

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

Topographic surveys are conducted for

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

Determining the shape of the surface of the ground and the

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

location of natural and artificial features on it

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

South parallel and west meridian

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

the adjoining Cadastral Map number on the West of a certain

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Cadastral Map is the latitude and longitude minus one minute of the
26
point of intersection the quadrangles of its extremes of
27
Marginal lines of 50 x 50 centimeters
28
Project control map shall be prepared at any appropriate scale
29
that will allow the plotting of entire municipality in a drafting film with
30
Relocation survey
31
Geodetic engineers who are commissioned by the
32
owner/developers on a property to be developed into housing
33
subdivision project
he shall first conduct in the area
34
360°-observe horizontal angle-bearing of start+ 180°
35
Polaris observation of Western Elongation
when the mark is
36
on the right of star
the true azimuth station to mark equals
37
A separate lot
38
When a claimant insist upon her rights to be taken by a right-
39
of-way the be surveyed with the other portion of the claim as
40
Special Work Order Survey
41
manual for land surveys and cannot be subject of titling
42
50 meters
43
Side shots length using steel tape for residential lot corners
44
from control station shall not exceed
45
Ridge line
46
In topography
it is a line dividing the water sheds
47
one side water will flow in one direction
48
Regional Technical Director for lands
49
Advance surveys shall be made only after a written authority
50
is issued
upon recommendation of the
51
Be surveyed a cadastral lot
52
During the cadastral survey
foreshore lands shall
53
Number of 15" units
54
In secondary control traverse
the azimuth error of closure
55
divided by 15
the quotient represents the
56
Lower clamp screw
57
After taking a back sight on the rod held at the station then a
58
foresight be taken at the forward station by loosening the
59
From one to the last number of the project
60
When a cadastral project comprises only portion of a city or
61
municipality
the numbering shall begin consecutively
62
Numerical sketch and survey record
63
After the completion of the sketch and survey
name of
64
geodetic engineer and claimant or representative who appeared with
65
signature
date of survey and appearance
66
the
67
North parallel and East meridian
68
The adjoining Cadastral Map number on the Northeast of a
69
certain Cadastral Map in the latitude and longitude of the point of
70
intersection in the quadrangles of its extremes of
71
10 centimeters
72
in residential areas
the position of the corner of the earlier
73
survey shall be adopted
when the position of corner of old survey and
74
the new survey as determined differ by not more than
75
180°-observed horizontal angle-bearing of star
76
Polaris observation at Western Elongation
when mark is to
77
the left of star
the true azimuth station to mark equals
78
Four months
79
Isolated surveys within the cadastral project must be
80
submitted to the Land Management Sector for verification through the
81
Chief of Cadastral project within
82
360°-A-(observe horizontal angle)
83
In morning observation when the mark observed is on the
84
Northeast and on the left side of the sun
the true azimuth of the line
85
(station occupied to mark)
86
The project control has been approved
87
Advance survey is allowed in on-going cadastral project
88
based on sufficient urgent needs of claimant
provided that at least
89
5 meters or more in width
90
Stream
shall be excluded from the boundaries of the
91
property undergoing survey
having natural bed or channels
92
Relative error
93
The square root of sum of the error in latitude squared and
94
error in departure squared divided by the perimeter is the
95
Helical path
96
During the half of the year
the sun is above the celestial
97
equator and the other the sun is below the celestial equator in its
98
eastward motion following its apparent path know
99
Relative error closure
100
the ravense salate impures
botore leaving he place of survey
101
District Engineer of DPWH
102
sent to th Before provincial roads are monumented a notice shall
103
Angular error of closure
104
In primary control measurements by repetition the difference
105
in the starting back azimuth and the closing back azimuth of the initial
106
line is
107
Maximum allowable angular error of closure
108
multipied by shir serine umber of tertiary control traverse station
109
Observed horizontal angle
110
In stellar observation
the angular distance from mark to the
111
star is
112
Need not be accounted
113
primeters