12 Flashcards
(73 cards)
1:01 PM Sat May 31
GE Reviewer
.. •
Open in Word
• Done
Survey notifore final los surveys in the barangay
lot claimants must
notify boundary as sketched and monumented and they shall be
30 seconds ofaiary control of cadastral project the traverse must start
and closing reading to endary comtrol
and the instrument oremation
Lower came pome or orict sighted could be bisected by the use of
5 seconds
in primary control
triangulation closure not to exceed base
measurement by
Grid azimuth
Astronomical observation for azimuth on the lines of the
he uncontad cada ral hecat
other than line BLM No. 1 10 2
subdivided by cased it readie regist in shal le amended or
NAMRIA
Parallax
In levelling
the cross-hair of the telescope appears to move
with respect to the object being sighted is due to the effect of
Barometric
Herein listed methods of levelling
which is the fastest?
2 monuments