6 Flashcards

(98 cards)

1
Q

Personal

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

When the bubble of an engineer’s level is not exactly

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

centered at the instant of sighting

A

the error is

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

180° horizontal angle mark to star

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Polaris at lower culmination

A

when the mark is on the left

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

side of star

A

the true azimuth station occupied to mark equals

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

NAMRIA

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

In delimitation of survey of forest reserves area done by

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

authorized private geodetic engineers

A

the GPS data for processing and

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

adjustment to PPCS-TM/PRS’92 shall be submitted

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Regional Executive Director

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

During the cadastral survey

A

adverse claim inside leased

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

properties shall be disregarded unless supported by written authority

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

from the

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Amendment survey

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

It is a survey made for the purpose of changing the boundary

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

lines by increasing or reducing the number of corners previously

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

surveyed or consolidating/subdividing the area without including any

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

new area

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

The number next to the highest lot number of previous survey

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

When a cadastral survey of the remaining unsurveyed

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

portions of the city or municipality is made

A

the lot umber shall begin

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

10 seconds

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

In secondary control traverse

A

the probable error of

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
astronomical observation not to exceed
26
Provide technical assistance
27
in political boundary disputes
the Department of
28
Environment and Natural Resources shall
29
(Azimuth of the sun) - (Observed Horizontal Angle)
30
In morning observation
when the mark observed is on the
31
Southwest and on the right side of the sun
the true azimuth of the line
32
(station occupied to mark) is
33
60 days
34
From the date of issuance of cadastral project survey order
35
geodetic engineers shall submit a list of their survey in progress inside
36
the project to the Chief of cadastral project within
37
As separate lot
38
When adverse claimants do not desire a survey of the claims
39
to be made
all adverse claims which lie entirely or a portly within a
40
tract undergoing survey shall be indicated in the plan and surveyed
41
Regional Technical Director
42
Survey authority or order in public land subdivision and
43
group settlements and cadastral survey up to 1
500 hectares shall be
44
issued by
45
Regional Executive Director
46
Survey Authority or Order in Public Land Subdivision and
47
Cadastral Surveys above 1
500 hectares shall be issued by
48
Dip
49
In mine surveying
the vertical angle between the plane of the
50
vein and a horizontal plane measured perpendicular to the strike
51
Not exceeding 3 minutes of are
52
In the portions of project where the land is divided into large
53
lots like hacienda
reservations and similar tracts
54
traverse shall be established at intervals of
55
Not extend beyond boundaries of the claim
56
5 centimeters
57
The secondary control station shall also serve as political
58
soundary courd and more by cylindrical concrete monuments and
59
Bureau of Lands Location Monuments shall be marked by
60
concies procions 40 ground centimeters set on the ground
61
City/Municipal Engineer
62
or municia dared some orland ade shal a atual or proposed diy
63
Along the boun dory linor mineral land survey is inaccessible
corners
64
shall be defined by two witness corners which shall be placed as near
65
as possible to the inaccessible point
66
Shall be numbered as a separated lot
67
claimed a pride proper out ling vi Finine rist- prily of at
68
250 meters
69
Block boundary of housing subdivision shall be marked with
70
permanent concrete monuments and length shall be preferably
71
Resurveys
72
It is a survey made of a previously surveyed tract of land for
73
the purpose of voiding the original approved but undecreed survey due
74
to failure to include all the areas claimed by the applicants
75
Director of Mines and Geo-Sciences
76
In mineral survey
the topography of the previously approved
77
dit and versus is heliconer
he survey plan
78
Section 1 A
79
In a sectional cadastral maps scale 1:1000
the Northwest
80
(NW) section of the sectional cadastral maps scale 1:2000 is the
81
Serve as a check to vernier reading of a line
82
The engineers transit compass box is an instrument which
83
Junction station between loops
84
When the secondary control is divided into loops
at what
85
station an astronomical observation is taken?
86
Land Management Bureau
87
Cadastral survey project numbers shall be secured from the
88
Verification never any approved survey is reported lo be eroneous
89
as
90
10 seconds of arc
91
In a required series of astronomical observations for
92
excondary control traverse
the allowable probable eror shall not
93
Regional Executive Director
94
unclassified prey a rest shal orders fer lands within the classified and
95
Regional Technical Director or Regional Executive Director
96
Geodetic Engineers in the private practice who wants to enter
97
into cry or perision rod uners of LU's shall fist oblain witten
98
Added