16 Flashcards
(90 cards)
1:02 PM Sat May 31
GE Reviewer
..•
= 22% 04•
Open in Word
0 • Done
South parallel and west meridian
The corresponding map number of a projection map is the
latitude and longitude of the point of intersection in the quadrangles of
its extremes of
Regional technical director
After the boundary survey of group settlement project
the
scheme of subdivision prepared by geodetic engineer shall be approved
by the
54x54 centimeters
Uniform size of a cadastral map
Alphabetical file
placed in the
The sketch and survey record card shall
after completion be
Slope distance
in underground surveying
except in nearly level working
the distance from one station to the next station is measured on the
Below the station
the point sighinderground surveying the height of point is negative if