(AOM 1.3.0) Checklist / Flow / Briefing Triggers (Required Knowledge) Flashcards
Crew Briefing
(AOM 2.2.1)
Entire Crew assembled (PIC)
Aircraft Acceptance Flow
(AOM 2.12.1)
Pilot change or first flight of duty period or if maintenance has been performed on the aircraft.
Power On Checklist
(AOM 2.12.2)
Anytime electrical power is established for the purpose of aircraft movement.
Exterior Preflight Flow
(AOM 2.12.3)
Completion of Aircraft Acceptance Flow by one of the Pilots.
Interior Preflight Flow
(AOM 2.12.5)
Completion of Aircraft Acceptance Flow by one of the Pilots.
Cockpit Preparation Flow
(AOM 2.12.7)
Completion of POWER ON Checklist or completion of Postflight Flow and preparing for subsequent flight.
Departure Briefing
(AOM 2.2.2)
Completion of COCKPIT PREPARATION Checklist
Takeoff Briefing
(AOM 2.2.3)
Both Pilots seated in the cockpit
Before Start Flow
(AOM 2.13.1)
Ready to start engines.
Before Start Checklist
(AOM 2.13.1.1)
Before Start Checklist called for by LP.
Engine Start
(AOM 2.14.1)
Completion of BEFORE START Checklist
After Start Flow
(AOM 2.15.1)
Both engines started.
After Start Checklist
(AOM 2.15.1.1)
After Start Checklist called for by LP.
Taxi Flow
(AOM 2.16.3)
Clear of obstacles, established on taxi route.
Before Takeoff Flow
(AOM 2.17.1)
Approaching the takeoff runway.
W/in 2000’ of approach end of RW & #2 for takeoff
Before Takeoff Checklist
(AOM 2.17.1.1)
Before Takeoff Checklist called for by LP.
After Takeoff Flow
(AOM 2.18.3)
PF calls for flap retraction.
After Takeoff Checklist
(AOM 2.18.1.1)
Completion of After Takeoff Flow and workload permitting.
10,000 ft Climb Flow
(AOM 2.19.2)
Climbing through 10,000 ft MSL
Cruise Flow
(AOM 2.20.1)
Leveling at final cruise altitude.
Cruise Checklist
(AOM 2.20.1.1)
PF calls for Cruise Checklist.
Approach Flow
(AOM 2.21.2)
Descending through FL 180 or prior to commencing arrival or approach (whichever occurs earlier)
Arrival & Approach Briefing
(AOM 2.2.4)
Descending through FL180 or prior to commencing arrival or approach (whichever occurs earlier)
Approach Checklist
(AOM 2.21.2)
PF calls for Approach Checklist.