After 15 minutes with a scrub pad and water.
Wire supports.
An extension joint.
If you are using a vinyl concrete-patching mix instead patching compound.
Abrasive stone file.
Felt marker.
Grease pencil.
Grout bag.
Grout saw.
Line level.
Marging trowel.
Mason’s string.
Point punch.
Pointing trowel.
Stud driver.
Tile scorer.
Water level.
16”.
3-1/2”.
Min 6x6 - 10X10 welded wire mesh between center. and upper third of slab secured in place during pour.
Screed, (skrYd).
1.Flashing sloped to drain. 2. Weep holes max 33 in. o.c. 3. Min 1” air space. 4. Metal ties max 24 “ o.c.