REM C LVL 2 Flashcards
Stranded steel wires in a group which generally is not part of the conducting system, its primary function being to support wires or cables of the system.
A. guy
B. messenger
C. support
D. conduit
B. messenger
Define as wires or cables entering the building, terminated to the main cross connecting point within the building
from the nearest telephone facility.
A. local loop
B. service entrance
C. drop wire
D. subscribers loop
B. service entrance
A smoke detector, using sampling tubes, that senses smoke in the air circulating within air-conditioning or ventilating ducts.
A. Duct Detector
B. Multi-criteria Detector
C. Flame Detector
D. Beam Detector
A. Duct Detector
The minimum voltage value that is
considered hazardous is:
A. 50 V RMS AC
B. 45 V RMS AC
C. 24 V RMS AC
D. 12V RMS AC
B. 45 V RMS AC
An opening underground run or system
into which workers reach, but do not
enter.
A. handhole
B. rathole
C. finger hole
D. manhole
A. handhole
A detector that detects abnormally high
temperature, abnormally fast rate of
temperature rise, or both.
A. Duct Detector
B. Carbon Monoxide Detector
C. Heat Detector
D. Smoke
C. Heat Detector
A general term applied to the whole or
portion of the physical property of a
communication company which contributes to the furnishing of communication service.
A. division
B. plant
C. zone
D. area
B. plant
What refers to as linkage by wire, radio,satellite or other means, of two or more telecommunications carrier or operators with one another for the purpose of
allowing or enabling the subscriber of
one carrier or operator to access or
reach the subscribers of the other
carrier or operator?
A. Interconnection
B. Outside plant sharing
C. Gateway
D. Toll patching
A. Interconnection
An undertaking the object of which is to
transmit audio, video, text, images or
other signal or messages for reception of a broad audience in a geographical area via wired or wireless means.
A. Communications
B. Broadcasting
C. Telecommunications
D. Transmission Engineering
B. Broadcasting
“Powers, Functions and Responsibilities of the CPD Councilrdquo; is provided in what section of RA 10912?
A. Section 8
B. Section 6
C. Section 7
D. Section 5
A. Section 8
“Separability Clause” is provided in what
section of RA 10912?
A. Section 18
B. Section 19
C. Section 17
D. Section 16
C. Section 17
RA9292 defines ____ as “shall include but not be limited to office buildings, hotels, motels, hospitals,condominiums, stores, apartments,
supermarkets, schools, studios, stadia,parking areas, memorial chapels/parks,watercraft and aircraft used for business or profit, and any other building/s or area/s for business purposes, where electronic or electronically-controlled machinery or equipment are installed and/or are
being used, sold, maintained,
assembled, manufactured or operated.”
A. Consulting Services
B. Commercial Establishment
C Industrial Plant
D. Communications
B. Commercial Establishment
RA9292 defines ____ as “shall include services requiring adequate technical expertise, experience and professional capability in undertaking advisory and review, pre-investment or feasibility studies, design, planning,
construction, supervision, management and related services, and other technical studies or special studies in the field of electronics engineering.”
A. Communications
B. Industrial Plant
C. Consulting Services
D. Commercial Establishment
C. Consulting Services
Within_ years after the effectivity of
RA 9292, the Board shall issue
Certificate of Registration and
Professional Identification Cards
without examination to all applicants for
registration as Electronics Technicians
who comply to all the requirements
stated in section 20.
A. 5 (five)
B. none of these choices
C. 7 (seven)
D. 3 (three)
A. 5 (five)
To pass the licensure examination, a candidate for Electronics Engineer or Electronics Technician must obtain a passing rating of seventy percent (70%) in each subject given during the
examination. However, if a candidate
who obtains a passing rating in the
majority of the subjects but obtains a
rating in the other subject/s below
seventy percent (70%) but not lower
than sixty percent (60%), shall be allowed to take one removal examination on the subject/s where he/she failed to obtain the passing rating:Provided, finally, that should the examinee fail to obtain a passing rating in the removal examination, he/she shall be considered as having failed the entire licensure examination. In which section of RA 9292 can this rule be found?
A. Section 18
B. Section 19
C. Section 17
D. Section 16
D. Section 16
RA9292 defines ____ as “any transmission, emission or reception of voice, data, electronic messages, text,written or printed matter, fixed or
moving pictures or images, words
music or visible or audible signals or
sounds, or any information, intelligence
and/or control signals of any design/
format and for any purpose, by wire,radio, spectral, visual/optical/light, or other electronic, electromagnetic and technological means.”
A. Telecommunications
B. Broadcasting
C. Information and Communications
Technology
D. Communications
A. Telecommunications
RA 9292 interprets ____ as “all
manufacturing establishments and
other business endeavors where
electronic or electronically-controlled
machinery or equipment are installed
and/or are being used, sold, maintained,
assembled or operated.”
A. Telecommunications
B. Commercial Establishment
C. Industrial Plant
D. Electronics
C. Industrial Plant
Section 31 of RA 9292 refers to
A. Qualifications for Examinations
B. Practice of the Profession
C. Continuing Professional Education
(CPE)
D. Repealing Clause
C. Continuing Professional Education
(CPE)
In handling unsolicited or unwanted
commercial and promotional
advertisement and surveys,
complainants who are not satisfied with the action of the Public Telecom Entities or Content Providers may bring the
matter to the NTC in writing within ____
from receipt of the alleged text spam.
A. 3 months
B. 1 month
C. 5 months
D. 7 months
A. 3 months
As provided in ACT 3846, the
construction of a radio station shall
begin only when
A. The NTC has already issued a Permit to
construct.
B. the firm applying for the construction permit has submitted to the NTC its application for the same.
C. the technical documents has already been
signed and sealed by the PECE.
D. A personnel of NTC has conveyed through telephone that the application has already been approved.
A. The NTC has already issued a Permit to
construct.
According to NTC Memorandum
Circular 4-2-92, this is a certificate or
written authority issued by the NTC to a
person, firm, company, association or
corporation authorizing the holder
thereof to operate during the period
specified in said authorization a mobile
station in the maritime mobile service
located on board a vessel.1
A. Cargo Ship Safety Radio Certificate
B. Ship Radio Station License
C. Ship Earth Station License
D. Exemption Certificate
B. Ship Radio Station License
What government agency was
designated as the chairman of the
Electronic Commerce Promotion
A. DOTC
B. NEDA
C. NTC
D. DTI
D. DTI
This memorandum circular shall cover
all wireless data networks and devices
operating within 2400MHz to 2483 MHz,5150MHz to 5350MHz and 5470MHz to 5850MHz bands
A. NTC Memorandum Circular 4-2-92
B. NTC Memorandum Circular 08-07-200
C. NTC Memorandum Circular 09-09-2003
D. NTC Memorandum Circular 04-06-2007
C. NTC Memorandum Circular 09-09-2003
In accordance with Radio Laws and
Regulations, a base station in the Land Mobile Service must maintain entry in its logbook, for a period of ____ if emergency signal is received.
A. 2 years
B. 1 year
C. 3 years
D. 4 years
A. 2 years