GP1 UPS Info
Toshiba G9000
GP1 UPS Size
750kW
of UPS at GP1
6 UPS 3 on each leg
GP1 - UPS Power Design Load
2000kW Total 1000kW on each leg
GP1 UPS Type
IGBT Double conversion
GP1 UPS Voltage
480v in 480v out
GP1 - # of battery strings on each UPS
3 strings of 40 batteries there are 40 batteries in each cabinet There are 4 cabinet for each UPS so there is an empty cabinet for each UPS.
GP1 UPS Configuaration
2N (A B) N+1 internally on A or B limited to the UPSs
GP1 ATS manufacturer is
GE/Zenith
GP1 ATS size
4000 amp 480v
GP1 ATS type
Closed transition / bypass
GP1 How are the generators started for emergency operation?
ATS which monitors power quality. It watches for any changes that are outside of parameters on all three phases, voltage drops and outages.
GP1 ATS type
Closed transition / bypass isolation
GP1 How are the generators started for exercising?
The ATS has a schedule built into its control package that will start the generators without a load transfer.
How long are the generators exercised?
30 minutes
How often are the generators exercised?
every other week
How often is maintenance performed on the generators?
Bi-annually. Major and minor.
What does major maintenance consist of for a generator?
All of the standard checks, visual etc and fluids. Oil change if necessary, based on the number of operating hours on the generator. Load bank
What does minor maintenance consist of for a generator?
Visual inspection, fluids checked and changed if needed.
How often is UPS maintenance performed?
Annually.
How often are batteries maintained and tested?
Bi-annually
How often are batteries maintained and tested?
Bi-annually
What does the UPS do when there is a power outage?
It maintains the power load that is currently on it by transferring to battery.
GP1 How long can the UPS support the load on battery?
7 minutes at 100% load.