What is not to be used in the cleaning of inflatable equipment ?
Solvents
pg. 2-1
1
When cementing life rafts, how long must the cement cure with no internal pressure?
Min 48hrs
pg. 2-2
2
What is the torque for inflation/deflation valves?
25-30 inch pounds
pg. 2-4
3
How many inches between top of neck and flotation collar back on the LPU-27/PE?
5 inches
pg. 2-21
4
What are the only authorized airline style passenger life preservers for use on CG fixed wing aircrafts?
AV-35A, AV-35H and FV-35/3505
pg. 2-29
5
The LRU-25/A crew raft leak test/inspection should be perform at what intervals?
Not to exceed 360 days
pg. 2-32
6
The 406 PLB operates in what frequency?
121.5MHz also 12 channel GPS receiver and doesn't float
4-9
7
What indicates the 406 PLB is transmitting a distress signal?
Red LED flashes every 2 seconds
pg. 4-11
8
The forward osmosis desalination pouch converts saltwater or contaminated fresh water into a potable energy drink removing _____% of salt in sea water
97%
pg. 4-27
9
How much time do you have to consume the drink mix?
Within 24hrs
pg. 4-28
10
You must wait a minimum of _____ hours before consuming the drink mix
8hrs
pg. 4-28
11
What is the shelf life for the SEAPACK Crew?
5 years
pg. 4-28
12
How often are oxygen masks overhauls completed?
Every 72 months