What is the building safety repairs pledge?
An overview of the building safety repairs pledge is required.
Were you involved with the due diligence?
Yes, my role in the due diligence process needs to be discussed.
Can you talk me through the construction of the combustible materials to the building?
Details on the construction of combustible materials are necessary.
What is PAS 9980?
An explanation of PAS 9980 is needed.
Why did you install a liquid overlay roofing system?
The reasons for installing a liquid overlay roofing system should be explained.
How did you go about designing the new non-combustible render system?
The design process for the new non-combustible render system needs to be outlined.
Why would it have been difficult to reinstate any opening up?
Challenges in reinstating any opening up should be discussed.
Why did you select a JCT600 intermediate building contract?
The rationale for selecting a JCT600 intermediate building contract needs to be provided.
What planning considerations did your project have?
Planning considerations for the project should be detailed.
Can you talk me through the detail of the boiler flus?
Details regarding the boiler flus need to be explained.
Why would disturbing the flu have caused carbon monoxide to be disturbed?
The implications of disturbing the flu on carbon monoxide should be clarified.
Why was the mounting plate integral?
The importance of the mounting plate needs to be discussed.
Given the logistical complexities with option one, why was this considered?
The reasoning behind considering option one despite logistical complexities should be explained.
How did you go about assessing the additional cost?
The process for assessing additional costs needs to be outlined.
What sections of building regulations approved document L did you need to comply with?
The relevant sections of building regulations approved document L should be specified.
How did you go about sourcing a compliant A2-S1?
The sourcing process for a compliant A2-S1 needs to be explained.
Can you talk me through the seamless system?
Details on the seamless system should be provided.
How did you go about dewpoint calculations?
The approach to dewpoint calculations needs to be outlined.
How did you go about preparing your drawings?
The process for preparing drawings should be explained.
How did you advise the client on window detail design and fire stopping?
Advice provided to the client on window detail design and fire stopping needs to be discussed.
How did you ensure the works were carried out correctly?
Methods for ensuring the works were carried out correctly should be outlined.
Given the known issues with inherit defects and workmanship, how did you manage this?
Management strategies for known issues with defects and workmanship need to be discussed.
What would you do differently next time?
Reflections on what could be done differently next time should be shared.
How did you act ethically?
The ethical actions taken during the project need to be explained.