How have you dealt with a planning or building control application?
I have navigated the application process by ensuring compliance with local regulations and coordinating with relevant authorities.
How have you dealt with a licence application for property alterations or other consents?
I have prepared and submitted detailed applications, ensuring all necessary documentation and approvals were in place.
Tell me about when you have carried out inspections / prepared reports for schedules of condition and dilapidations and negotiated with party representatives?
I have conducted thorough inspections, documented findings, and engaged in negotiations to resolve any disputes.
Tell me about your preparation of a building reinstatement cost assessment.
I have assessed the costs associated with reinstating a building to its original condition, factoring in materials and labor.
Talk me through your experience of carrying out health and safety obligations during works for clients, including design works.
I have ensured compliance with health and safety regulations throughout the project lifecycle, including during the design phase.
Talk me through your experience of carrying out an application for listed building consent, conservation area consents etc.
I have prepared applications that detail the proposed works and their impact on the historical significance of the property.
Talk me through your experience of reviewing and reporting on lease obligations / party wall inspections and negotiations / rights of light inspections and negotiations.
I have conducted reviews and inspections, providing detailed reports and facilitating negotiations between parties.
Why did you organise an asbestos refurbishment and demolition survey?
The survey was necessary to identify and manage asbestos risks before any refurbishment or demolition work commenced.
Why was Asbestos removal required?
Asbestos removal was required to ensure the safety of workers and occupants, complying with health regulations.
What are the options? Did the client have?
The client had options for encapsulation, removal, or management of asbestos, depending on the condition and location.
What was the contents of your preconstruction information?
The preconstruction information included details on site conditions, hazards, and specific requirements for safety.
How did you go about preparing the risk assessment?
I conducted a thorough analysis of potential hazards and developed a risk assessment to mitigate identified risks.
What was the contents of your building regulation application?
The application included plans, specifications, and compliance statements to demonstrate adherence to building regulations.
Why was this required?
This was required to ensure that the proposed works met safety and structural standards set by local authorities.
What building regulation approved documents did you review?
I reviewed approved documents related to structural integrity, fire safety, and accessibility requirements.