Design registry and Documentation and training Flashcards
The installer shall ensure that the manufacturer’s instructions supplied with the appliance are left with who
the user
Who trains the operator/owner
The installer
What other litature should be supplied to owner/operator (Other than manual)
As-built diagrams
Name 7 steam boiler dairy maintance
Check water level glass gauge, record the pressure gauge and temperature gauges.
Check LWCO and ALWCO operation – blowdown water column – make the burner shut down.
Drain gauge glass.
Turn off burner control switch, observe response to flame failure.
Observe operating control and high limit control.
Perform Bottom Blowdown to remove sludge and sediment.
Observer Burner refractory cone, looking for broken chunks.
Name 5 steam boiler weekly maintenance
Check all linkages on burner controls and on the automatic draft controllers.
Check air damper on burner.
Check valve operation in gas train.
Check pilot and igniter, look at the condition of flame.
Check operation of LWCO – blowdown boiler water level through drain. Watch gauge glass to see burner cut off before losing sight of water.
Name 6 steam boiler monthly services
Test limit controls on boiler.
Test flame detection controls.
Check blowdown for sludging at bottom of boiler.
Verify blowdown separator and cooler operation.
Check floor drains for proper function.
Check boiler fresh air inlet screens.\
Name 7 Annual steam boiler maintenance
Disassemble and check LWCO and ALWCO for sludge, corrosion or electrical switch defects.
Verify and tune up burners and settings. it is recommended to do quarterly tuning by a qualified technician
Inspect fire side for soot or damage and water side for scale or corrosion & Clean the boiler inside and out.
Hydro test boiler for leaks (tube joints and piping).
Inspect all refractory for fallen broken chunks.
Check gas regulator pressure settings. Replace or re-certify safety valves.
*refer to the B51-20XX Table 5 - Testing Pressure Relief Devices handout.
Leak test (Bubble test) fuel train safety shut-off valves.
End user trainer documentation (4)
Maintenance records
Log books
Chemical reports
Trend logs
Rules for log books
Hard bound cover
No missing pages or torn
Pages dated or numbered
Clean safe location in engineer office
Kept for 7 years
People who write in it all capital and full name
Person in charge sign or initial every page
No foul language or inappropriate things
Which 2 reports kept with maintenance log
Chemical Reports and Trend Logs
Who does chemical reports
Chemical company
What is the design registration
Design registration is a process for Technical Safety BC to review and register a design of a regulated product or installation for specific types of technologies.
If you upgrade a system from linkage to something else what is needed
Would require a Product Approval of the upgraded control system