Maintenance of small gas Utilities & Decommission & disconnection of appliances Flashcards

(41 cards)

1
Q

A person who finds any appliance or gas equipment beyond repair or in an unsafe condition must what

A

place the appliance or gas equipment out of service, and
promptly notify a safety officer of its condition and location.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What do you do if you verbally commission an appliance

A

promptly confirmed by a written statement setting out the facts.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

If a replacement appliance is planned to be installed what should be done

A

Lock off gas and electrical
Cap and plug

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

If a decommissioned appliance is not going to be replaced what do you do

A

removal of the electrical, gas, water, venting, etc.
Gas line capped/plugged and purged

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What do you do for Water and/or Steam Connections if the appliance is being replaced

A

Make sure any valves are blanked and locked out if the boiler is being replaced.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What do you do for Water and/or Steam Connections if the appliance is not being replaced

A

The piping should be completely removed if the boiler is not being replaced.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What do you do with the venting and ducting if the unit is not being replaced

A

Removed and capped

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What do you do with ancillary equipment and accessories if unit if decommissioned

A

Any ancillary equipment and accessories should be isolated and removed for a decommissioned appliance.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What sheet is needed for removal of hazardous materials

A

Safety Data Sheet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

If the class location of a section of a pipeline changes to a higher designation that has a more stringent location factor, the company shall

A

within six months after the change, submit the proposed plan to deal with the change to the Regulator.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

If a company proposes a change of service or an increase in the maximum operating pressure for the pipeline, the company shall submit what

A

an application for the change or increase to the Commission.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

If there are any changes to a piping system that include relocating or replacing any piping, monitoring/test station, or compressor station what should be done

A

A detailed plan created
Maps and drawings should also accompany any plan that shows the new location of any of the above

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is a common method used in various industries that uses a low electrical current to prevent corrosion of metal structures

A

Cathodic protection

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

what is the first line of defence against corrosion

A

external protective coating

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

How does protective coating work

A

physically isolate a reactive material, such as steel, from the electrolyte, such as the soil surrounding it

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

How is the pipe coating selected and by who

A

Coatings shall be selected after a careful analysis of the specific characteristics of each piping system to be coated by competent personnel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Which system does not require an external power source

A

Galvanic Anode Systems

18
Q

How are Galvanic Anode rods connected to piping system

A

Insulated wiring

19
Q

What material are Anode rods made of

20
Q

What back fill will enhance performance and prevent passivation of the galvanic anodes.

A

a special low-resistivity chemical backfill consisting of gypsum, bentonite and sodium sulfate

21
Q

Impressed current systems consist of what

A

an external direct current source connected to impressed current anodes and the piping system by insulated cables.

22
Q

in Impressed Current Systems what are the anodes connected to

A

The anodes are connected to the positive terminal of the direct current source.

23
Q

Direct current sources for impressed current systems

A

Rectifiers powered by alternating current supplied by an electrical utility
Generators
Solar energy sources
Thermoelectric generators
Fuel cells
Batteries

24
Q

Warning signs near the direct current source and cables shall be prepared in accordance with?

A

all applicable regulations, codes, including The Canadian Electrical Code, Part I (CSA Standard C22.1, Section 80 – Cathodic Protection)

25
What should the back fill be made of
coke (metallurgical, petroleum, or graphite
26
Why would venting be required out of back fill
to avoid possible detrimental effects of entrapped anodic reaction gases (e.g. in deep vertical ground beds).
27
Why are test stations provided
to ensure effective testing or monitoring of cathodic protection performance
28
Piping system locations subject to hazardous induced AC voltages that have been identified by test results shall have what
shall have test stations with dead front construction
29
Wire to wire, or cable to cable connections are typically what
made with split bolts or positive compression crimps coated to maintain the integrity of the wiring insulation system
30
Methods to connect copper conductors to steel and other ferrous pressure piping
thermite welding, pin brazing, and mechanical means.
31
Methods to connect aluminum conductors to aluminum piping systems
high energy joining, welding and mechanical means.
32
Methods to connect copper conductors to copper piping systems
arc welding (TIG, MIG, shielded metal), electrical resistance welding, brazing, soldering and mechanical means.
33
The preferred method of inspection
holiday detector
34
How soon after piping system installed should the initial survey be performed
Initial survey shall be performed as soon as practicable, but no more than 12 months after piping system installation
34
When should all impressed current facilities should be inspected and maintained
Once per year
35
When problem is found how soon should it be fixed
As soon as practically possible
36
In-line inspection tools are used to detect
areas of metal loss by using magnetic flux leakage, ultrasonic and eddy current techniques
37
Whenever piping is exposed, it should be visually inspected for
both condition of the external coating and evidence of corrosion
38
whenever the piping is exposed in areas known to be susceptible to stress corrosion cracking what should be done
an examination for the presence of SCC should be considered
39
When should a company notify of any incident relating to the construction, operation or abandonment of its pipeline
the company shall immediately notify the Regulator and shall submit a preliminary and detailed incident report to the Regulator as soon as is practicable.
40
When does a company report deactivation and whats included on the report
after 12 months and reason why it was deactivated