Lecture 11- Lean engineering planning Flashcards

(8 cards)

1
Q

What is the Ship design phase blueprint?

A

-Concept phase- Basic idea, general arrangement and performance prediction

-Basic/Functional design- Much more detailed

-Detail design: 3D modeling, every small detail is checked and finalized

-Production documentation: Extract plans, drawings, part list for contractions

-Follow up- Engineers support during actual building

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Give some examples of what is NOT lean in shipbuilding

A

-Moving materials unnecessarily

-Waiting for tools or instructions

-Making too many parts

-Reworking defective parts

-Not using works full skills

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Planning in shipping?
Its three of them

A

-Level 1: Master plan- General timeline with the big picture

-Level 2: Procurement and production plans

-Level 3: A much more detailed plan

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What are the three purchase categories in procurement

A

-Lump sum agreements= High importance items

-Frame agreements= standard parts in large numbers

-Direct purchase= small items with low risk

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Variation order (VO) means?

A

A formal change to the original scope of work during a project and can be caused by design errors, owner request, supplier delays or new requirements.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Red- dot meeting means?

A

Is a focused team meeting used in shipbuilding to quickly identify and remove obstacles that are blocking process.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The purpose is to focus of Red- dot meeting means?

A

-What is blocking the process

-Who is responsible for solving it

-What is the deadline

-What resources are missing (people, tools, documents, space, materials)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

After ending a project or even during the building, the team must collect lessons learned are?

A
  • What went wrong
  • What worked well
  • What to improve