Fill in the blank:
______ cubic yards are in the shape defined by grid points C5, C8, E5 and E8. Select the closet answer.
28
Sheet 2/15 and sheet 10/15
Footing mark 3 – eight (8) footers 8’ – 6” x 6’ - 6” x 1’ – 8”
= 8 x 8.5’ x 6.5’ x 1.66’
= 736.37 cft ÷ 27 cyd/cft
= 27.27 cyd
Fill in the blank:
______ inches of compacted limerock are to be placed beneath the asphalt surface of all parking areas.
6
Sheet 2/15 detail drawing A/2
Fill in the blank:
______ measured in-place cubic yards of topsoil are required for the planters if the topsoil layer is 10 inches deep. Select the closet answer.
1.97
Sheet 11/15 - Inside dimension of each planter = 5.66’ x
5.66’ = 32.11 sqft 32.11 sqft x .83’ = 26.65 cft per planter.
26.65 cft x 2 planters = 53.30 cft ÷ 27 cyd/cft = 1.97 cyd
Fill in the blank:
This project will require ______ lineal feet of “key”. Select the closet answer.
88.67
Sheet 2/15 - “Key” is used to form the joint between the
walls and floors of the Elevator Pit and the Planters
Elevator pit centerline (add 8” to each side) perimeter = 38
lineal feet (LF) Planter centerline perimeter = 25.33 LF x 2 = 50.67 LF
Total = 38’ + 50.67’ = 88.67 LF
Fill in the blank:
The distance from point C to point D is ______ .
175 yds
Since you know that one leg of the 45◦ triangle is 50 yds,
then the other leg is also 50 yds 75 yds + 50 yds + 50 yds = 175 yds
Fill in the blank:
A fencing contractor is invited to submit a bid to enclose the entire site in 6’ construction site security fencing. If the contractor charges $12 per running foot for such fencing, his bid pricing will be ______.
$14,092
Calculate the perimeter of the property
Line AC = √50 + 50 = 70.71 yds
22
Line BD = line AC = 70.71 yds
Line AB = 75 yds (given)
Line CD = 175 yds (from previous question)
Perimeter = AB + BD + AC + CD = 75 + 70.71 + 70.71 + 175 = 391.42 yds. 1 yd = 3 ft
391.42 yds x 3ft/yd = 1,174.26 feet
1,174.26 ft x $12/ft = $14,091.12
Fill in the blank:
The Job Status Report, which indicates the percentage completed by each major construction activity, is completed by the ______.
Project Engineer or Field Superintendent
Fill in the blank:
The means of egress illumination level shall not be less than ______ foot-candle(s) at the walking surface.
1
Fill in the blank:
A contractor wins a job for a low bid of $120,000. If his total costs and expenses are $90,000, his margin of profit is ______ .
.25 or 25%
BGTA, pg. 272 & 273
Margin of Profit = Net Income / Sales
$120,000 - $90,000 = $30,000
$30,000 / $120,000 = .25 or 25%
Fill in the blank:
A proposal is a legal instrument that will not bind the contractor to the owner if ______.
The contractor forfeits the bid bond.
Fill in the blank:
Each end of a platform 10 feet or less in length shall not extend over its support more than ______ inches.
12
Fill in the blank:
A business’s ______ insurance shall apply if property damages caused by construction are experienced at a project after all work on the project has been completed and put to its intended use.
General Liability
Fill in the blank:
The thickness of concrete floor slabs supported directly on the ground shall not be less than ______ inches.
3-1 /2
Fill in the blank:
A (The ) ______ is (are) not required for a plan review by the building official.
Plumbing elevations
Fill in the blank:
______ is (are) not required to be stored at the construction site.
Material invoices
Fill in the blank:
A general, building, or residential contractor is not required to subcontract the installation of wood shingles, wood shakes, or asphalt or fiberglass shingle roofing materials ______.
On new buildings of their own construction
Fill in the blank:
A contractor fails to file a Notice of Commencement on a $10,000 project. His initial indication of a problem will be ______.
When he is unable to get his first building inspection.
Fill in the blank:
In high-velocity hurricane zones, electrical conduit, mechanical piping or any other service lines running on the roof shall be raised not less than ______ inches above the finished roof surface.
8
Fill in the blank:
The vertical clearance from the public right-of-way to the lowest part of any awning shall be not less than __ feet.
7
Fill in the blank:
One set of approved construction documents shall be retained by the building official for a period of not less than ______ days from date of completion of the permitted work.
180
Fill in the blank:
If there are multiple liens on a project, only a limited amount of funds to pay the liens, and all liens were filed at the same time, ______ would be paid first.
2 hours
Fill in the blank:
Townhouses not more than three stories in height may be separated by a single wall providing such wall shall provide not less than a ______ fire resistance rating.
Liens of laborers
Fill in the blank:
General Contractors must subcontract ______.
Electrical wiring in a building of their own construction
Fill in the blank:
______ does not require a permit.
Installing a portable cooling unit