What is the definition of PROCESS instrumentation?
Process instruments are those permanently installed in the plant
What is the definition of TEST instrumentation?
Test instruments are those installed during testing
What is the definition of CONTROLLED instrumentation?
Controlled instrumentation is used to determine the operability of safety related or control designated systems or components
How is CONTROLLED instrumentation identified?
Controlled instrumentation is identified by a control number and/or barcode
What is the definition of UNCONTROLLED instrumentation?
Uncontrolled instrumentation is used for information only purposes
How are UNCONTROLLED instruments identified?
Green stickers show calibration data in black
When can UNCONTROLLED instrumentation be used in safety related tests?
Uncontrolled instruments may be used for safety related tests when the procedure doesn’t ask for calibration data
What is the definition of RESTRICTED instrumentation?
Restricted instrumentation is test instrumentation calibrated to a different range than its originally intended use.
How is RESTRICTED instrumentation identified?
Restricted instrumentation identified with Yellow restricted stickers with calibration date and restricted range
If info will not fit on the sticker, then I&E keeps a data sheet
What is the definition of REJECTED instrumentation?
Rejected instrumentation is test instrumentation that is out of its normal calibration interval, cannot meet manufacturer’s calibration specs, or is suspected to be damaged or out of tolerance.
How is REJECTED instrumentation identified?
Rejected instrumentation is identified by Red and White sticker, with the reason why the instrument is rejected
How/where is instrument status identified?
2. Tool Management System
Where is contaminated test equipment stored?
The Hot Tool Room
Where is clean test equipment in the RCA stored?
Clean test equipment in the RCA is also stored in the Hot Tool Room but should be used only for clean applications
What is the person using a piece of test equipment required to ensure?
Who checks test equipment out?
2. Nights or weekends requires the individual to check it out
What is required if test equipment is used without checking it out?
A NCR must be written to document this occurrence
What are the responsibilities for an individual checking out test equipment?
What shall the individual know when selecting test equipment and plant tools?
How is the appropriate test equipment chosen in regards to instrument range?
When are snubbers used with test equipment?
A snubber is required if the measured pressure fluctuates exceedingly
What guidelines are adhered to when routing cables for test equipment?
Who must be notified when removing, and returning, instruments to service?
The Control Room Supervisor if indication will be affected
What are some basic steps for test equipment setup?