Flashcards in Water Supply Deck (23)
Loading flashcards...
0
Whose responsibility is it to establish and coordinate fill sites, dump sites, shuttle routes or relay operations during a rural water supply incident?
Water Supply Group Supervisor
1
The Water Supply officers bag and Jurisdictions water pre-plans are carried on...
All Command Vehicles
2
Water supply pre-plans for non-hydrant areas should be made and sent to...
The first 6 companies
3
A Tanker Task Force consists of the following
One engine, three tankers, one command officer
4
The officer if the ______ Engine shall assume the role of Dump Site Unit Leader.
Third Engine
5
The "Fill Site Engine" will deploy _______ lines to facilitate the filling units at the fill site.
Two lines
6
The person responsible for managing all activities at the dump site is...
Dump Site Unit Leader
7
Who is responsible for connecting and disconnecting fill lines at the fill site?
Fill Site Crew
8
Personnel at the full site area need to wear ______ when working around open water?
PFD's
9
The low level strainer used with the dump tanks for drafting are carried...
Tankers
10
A rural water supply preplan book shall be maintained by...
Tanker Stations
11
While en route the first arriving engine officer should designate the...
Fill Site, Dump Site and/or Relay Operation
12
The layout from the first arriving engine in rural water supply should include...
Siamese
13
How often should dry hydrants be back-flushed and tested?
6 months
14
Relay operations, what does the fifth due engine officer and crew do?
Be given an assignment
15
Who assist the Battalion Chief with water supply group operations?
Second EMS Supervisor
16
What Code of Virginia allows fire departments the right to acquire water from whatever source is available?
1989
17
Low-level suction strainer uses available water down to how many inches?
2
18
Fire flow formula, how many minutes of fire flow is required for rapid fire control?
1-2
19
Engines with electronic governor controls draft and fill in which mode?
RPM
20
Who is in charge of the dump site until relieved by the third due officer?
Dump site engine driver
21
Drafting before dump tanks are set up, who attaches a line to the Siamese and supplies the attack engine?
First tanker driver
22