AUC 5 (Building Under Construction or Demolition) Flashcards Preview

FDNY > AUC 5 (Building Under Construction or Demolition) > Flashcards

Flashcards in AUC 5 (Building Under Construction or Demolition) Deck (4)
Loading flashcards...
1

During construction of a new building, or in spaces being added to an existing building, atleast ONE permanent stair shall be brought within how many FEET or how many FLOORS below the WORKING DECK?

40 feet or 4 floors

2

Whenever construction or demolition work reaches a height greater than ___ ft, atleast one elevator or a hoist shall be kept in readiness for FD use

75

3

The maximum distance between the highest accessible floor from a temporary elevator or hoist & the working deck of the building under construction or demolition shall be no more than ___ ft or ___ floors

75/7

4

In concrete construction the working deck is the? In steel construction the working deck is?

Floor being formed
The floor where the metal decking and steel components are being placed before concrete is poured