Where shall the RIT Kit be stored and transported?
In the RFPS Command Vehicle (Unit #538 or In-service backup command apparatus)
This ensures quick access during emergencies.
Who is responsible for retrieving the RIT Kit once on-scene?
An unassigned crew or crew member requested by the assistant chief (AC)
The AC takes command on-scene.
How is the HCN monitor activated?
By pressing and holding the ‘OK’ button for 3 seconds
A countdown will appear on the screen.
Where should the RIT Kit be deployed?
At the entrance of the structure near the on-deck crew or RIT
This is applicable if a RIT has been assigned.
When should the RIT Kit be deployed into the structure?
During rescue operations under the direction of the Incident Commander (IC)
This ensures proper command and control.
When does the RIT Kit remain deployed?
Until the termination of the incident or when the AC has been released from the scene
What should the on-deck crew do if an A2 alarm is achieved?
Immediately relocate with the RIT Kit to a position where the A2 alarm no longer sounds
What is the threshold for the A2 alarm on the HCN monitor?
4.5 ppm
This is below the NIOSH recommended exposure limit of 4.7 ppm.
Who retrieves the RIT Kit after operations are complete?
The field incident technician (FIT) or an unassigned crew member
How does the FIT power down the HCN monitor?
By pressing and holding the ‘+’ and ‘OK’ for 3 seconds
A countdown will appear on the screen.
Who is responsible for reporting RIT Kit use?
The assistant chief (AC) in the Equipment Used section of the incident report completed in FDM
When should the RIT Kit be inventoried?
At the commencement of each shift, following an incident where the RIT Kit was deployed, whenever deemed necessary
What components of the RIT Kit should be checked for proper function?
The SCBA emergency air components
Follow procedures in sections 2.1, 2.3, 2.4, 2.6, and 2.8 of RFPS SOP 231-04.
What must be recorded in the Command Unit Logbook?
The number of days to calibration for the HCN monitors
What action is taken when the days to calibration reach 10?
The FIT completes an e-form 50 to maintenance requesting recalibration and bump testing
What maintenance is performed on the RIT Kit on the first Monday of the month?
Disassembled, inspected, cleaned, and the air cylinder replaced
List the items included in the RIT Kit inventory.
- 1 - red True North L2 RIT bag
- 1 - Shoulder strap with carabiners
- 1 - Drager Pac 7000 HCN Monitor
- 1 - RescueAire Il Air System
- 1 - 45 minute - 4500psi MSA air cylinder
- 1 - MSA facepiece
- 6 - Chem Lights (glow sticks)
- 1 - cable cutter
- 4 - rubber doorknob bands
- 4 - door wedges
- 4 - nylon web straps (3”)
- 1 - seat belt scissor
- 1 - mini strobe beacon
- 1 - Pelican hand light