GM 806 Flashcards Preview

General Manual > GM 806 > Flashcards

Flashcards in GM 806 Deck (14):
1

***START***
Mobilization phase 1 is implemented for an unusual occurrence when the total manpower and resources assigned to the on-duty patrol division cannot:
a) Control the occurrence
b) ---------to other sections of the city
c) conclude the occurrence within a reasonable length of time

Provide adequate coverage

2

Mobilization phase 1 is implemented for an unusual occurrence when the total manpower and resources assigned to the on-duty patrol division cannot:
a) Control the occurrence
b) provide adequate coverage to other sections of the city
c)

Conclude the occurrence within a reasonable length of time

3

Mobilization phase 1 – – – is established and the necessary radio frequencies are assigned and dedicated specifically for the unusual occurrence operations

Field command post

4

Implementation of phase 1 mobilization is initiated by the command officer who was notified and responded. Notice of phase 1 implementation is made to who?
a) The deputy chief assigned to patrol division
b) – – – Or in his absence

Chief of police for in his absence the acting chief of police

5

Implementation of phase 1 mobilization is initiated by the command officer who was notified and responded. Notice of phase 1 implementation is made to who?
a) The ------assigned to ------
b) chief of police or in his absence the acting chief of police

The deputy chief assigned to patrol divisions

6

Phase 2 mobilization
All – – –, – – –, – – – are canceled excluding injury and sick leave

Leave, training and support activities

7

Mobilization recall
The notification message shall be formatted to inform the member of the phase status, brief description of the unusual occurrence, the required equipment, and the location and time to report for assignment. Phase 1 the incident commander notifies the -------------- of the personnel designated to recall

On duty communications unit shift supervisor

8

Mobilization recall phase 1
the communications unit shift supervisor notifies the office of the chief, Deputy chief assigned to patrol division and – – –

Emergency management coordinator

9

Mobilization recall phase 2 and phase 3
The office of the chief notifies – – – and – – –

Office of the city manager and mayor

10

Mobilization recall the incident commander ensures the recalled members receive specific assignments. Assignments are prioritized and given at the staging area. Assignments may be divided into four categories:
1)Relief of on-duty members
2) containment at the scene or control of the perimeter surrounding the occurrence
3) provide – – – to other sections of the city
4)assignments involving specialized needs are coordinated with the appropriate specialized unit commander

Service coverage

11

Mobilization recall
The incident commander determines the need for a 12 hour shift operation.
12 hour shifts are identified as follows:
the first shift is – – – the second shift is – –

Alpha
Bravo

12

T or F
The incident commander may request television and radio stations to assist in the recall of personnel for mobilization.

True

13

Mobilization phase 1 is implemented for an unusual occurrence when the total manpower and resources assigned to the on-duty patrol division cannot:
a) C
b) provide adequate coverage to other sections of the city
c) conclude the occurrence within a reasonable length of time

Control the occurrence

14

Who initiates phase 1 mobilization?

The command officer who was notified and responded.