AUC 269 Air Support Plan Flashcards
(8 cards)
The air rescue plan high rise structures has alert, assemble, and airlift phases. During the alert phase , notification is made by the Incident boro fire dispatcher direct to NYPD upon transmission of a doubtful _____ alarm for a fire associated with 1076, 1077.
Third alarm
The air support plan will be activated upon transmission of ?
Doubtful 2nd alarms for fire associated with 1076,1077,
1060, and all doubtful third alarms
When would the IC decide to “assemble” members?
- fire above the 10th floor in high rise building
- fire has possession of two or more floors
- interior access routes above fire blocked
- access to roof limited to exterior of building via helicopter
As high rise roof team officer u should insure?
All members have personal harness , firefighting equipment bagged and members on HT Tacu channel
Approach helicopter after signal from pilot, co-pilot, crew chief
Supervise loading and unloading in view of pilot as directed by crew chief
Monitor the HT Tacu ch 13
The HRRC and HRRT shall approach and board the air rescue bell 412 helicopter when directed by only who?
Pilot, co pilot , or crew chief
Approach the 412 bell from
The front when directed by pilot Do not go near the tail. Semi crouched position when approaching or leaving in single file
The air recon chief enters a different helicopter from ?
Amid ship (side)
When loading HRRK , one member does it directed by?
Crew chief
Note: the crew chief or pilot will designate riding positions