Collapse Flashcards
(24 cards)
Two of the 2nd alarm engines should be used to?
Seal off the ends of the street
What position should the first 2 engines take?
If possible, take separate hydrants outside the block , each on separate mains
Note: the 3rd and 4th engines should take similar positions at the rear of the structure
List first alarm engine responsibilities from highest to least priority
- extinguish active fire in the affected building AND surrounding debris
- protect exposures
- extinguish burning vehicles within the VICINITY of the collapse
- no fire? Then 2 1/2 to cover operation and 3 1/2 to TL
List the FDNY rescue plan in order for 1 to 5
- recon
- accounting for and removal of the surface victims
- search the voids
- selected debris removal and tunneling
- general debris removal
Who shuts the utilities?
The 2nd due truck
Note: this happens during the recon stage. Haz mat personnel can assist
What engine ensures that a 3 1/2 is stretched to a TL?
2nd due engine ensures 3 1/2 stretched to TL
What size line does 1st engine stretch?
2 1/2 Stretch sufficient lengths to cover entire site
CONSIDER stretching 3 1/2 to TL
Can 1st due engine administer CFRD duties?
No, the 2nd, 3rd and subsequent engines will administer Cfrd if necessary
Can the third due truck cut timbers ?
Yes
What engines can assist in the removal of lightly buried victims ?
The third and any subsequent arriving engines
The IC may direct who to operate the Con Ed vacuum truck ?
Only trained members of SOC. He shall call the SOC compressor unit to work with vacuum truck
Once shoring is installed , can the Fdny remove it ?
Shoring will only be removed when the load is otherwise stabilized or the situation permits the shores to be removed from a safe area
According to addendum 2 of collapse ops, all rigs must have ____ cans of lime yellow colored reflective spray paint
2
The search assessment marking system consists of ____ X _____
Marking when completed makes an X
2 feet by 2 feet
When new markings are made using the search assessment marking system, old markings shall be __________
Crossed out
A large V ( for victim) approximately 2 ‘ in height is painted near the location of a _________ or __________ victim . An arrow MAY be next to the “V” pointing toward location of victim if not clear
Known or potential
A circle is painted around the “V” when ?
The location of a potential victim has been CONFIRMED either visually, vocally or by hearing sounds that would indicate a high probability of a victim
What does a horizontal line through the middle of V indicate?
CONFIRMED deceased
A vertical line painted through the confirmed victim mark after the horizontal line was made making a cross indicates what ?
The victim has been REMOVED
Crush Syndrome (Smiling Death) is fundamentally based on what 3 criteria?
1 Prolonged compression (usually 4-6 hours but possibly less than 1 hour).
2 Compromised local circulation.
3 Involvement of muscle mass.
11.8.1
At a Collapse operation, What unit shall immediately begin the process of controlling the gas, electric and water services?
The 2nd Due Ladder Company
FFP Collapse 7.6
Emergency signaling system used by FEMA USAR Task force are:
1 Long Blast (3 Seconds)=
1 Long Blast (3 Seconds)= Cease Operations All quiet
9.2.2
3 short blast (1 second each)
3 short blast (1 second each)= Evacuate the area.
9.2.2
1 long and 1 short blast=
1 Long and 1 short = Resume Operations
9.2.2