The construction progresses by pouring___concrete floor_____day.
pouring ONE floor every OTHER day.
The method of forming the poured concrete floors consists of using___or___ plywood held in place by ___x___ wood studs.
5/8” or 3/4” plywood
4”x4” wood studs
SB 66
One shoring stud is placed every ___’ on center extending from the floor to the underside of the___.
4’ on center
underside of the plywood form above.
SB 66
It is required that every floor that has been stripped of its supporting plywood forms and is in its curing stage be reshored. This reshoring of 1 4”x4” stud placed every 8’ will usually be found on at least___floors below the most recently poured floor.
At least 8 floors below.
Variations in curing time can occur due to what 3 things?
1 Temperature
2 Humidity
3 Strength of concrete
SB 66
The three responsible people on a job site that can give the FDNY good info are:
1 A Construction Engineer
2 Building Superintendent
3 Concrete Foreman
If none of the previous 3 people are on sene FDNY should assume the concrete was poured within____hours.
within the prior 24 hours.
SB 66
Concrete Construction: Standpipe must be maintained up to and capped___floor below the STRIPPING floor.
ONE floor below the STRIPPING Floor.
BISP Ch 3 Add 2 2008 Construction Demo guide p 11