Q

The construction progresses by pouring___concrete floor_____day.

A

pouring ONE floor every OTHER day.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

The method of forming the poured concrete floors consists of using___or___ plywood held in place by ___x___ wood studs.

A

5/8” or 3/4” plywood
4”x4” wood studs

SB 66

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

One shoring stud is placed every ___’ on center extending from the floor to the underside of the___.

A

4’ on center
underside of the plywood form above.
SB 66

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

It is required that every floor that has been stripped of its supporting plywood forms and is in its curing stage be reshored. This reshoring of 1 4”x4” stud placed every 8’ will usually be found on at least___floors below the most recently poured floor.

A

At least 8 floors below.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Variations in curing time can occur due to what 3 things?

A

1 Temperature
2 Humidity
3 Strength of concrete

SB 66

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

The three responsible people on a job site that can give the FDNY good info are:

A

1 A Construction Engineer
2 Building Superintendent
3 Concrete Foreman

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

If none of the previous 3 people are on sene FDNY should assume the concrete was poured within____hours.

A

within the prior 24 hours.

SB 66

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Concrete Construction: Standpipe must be maintained up to and capped___floor below the STRIPPING floor.

A

ONE floor below the STRIPPING Floor.

BISP Ch 3 Add 2 2008 Construction Demo guide p 11

How well did you know this?
1
Not at all
2
3
4
5
Perfectly