***TB SCBA Add 1 FAST PAK Flashcards

(32 cards)

0
Q

The fitting between the Hansen Fitting and the Low/High Pressure assembly is called the?

A

Schrader Fitting

C

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

The fitting on the LP hose before the regulator is called?

A

Hansen Fitting

B

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The Low Pressure hose is___feet long.

A

20 feet long

D

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The high pressure hose is how long?

A

5 feet long

F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

At the end of the HP hose is__?

A

UAC Universal Air Connection Coupling

g

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

The FAST PAK is carried by all___,___&___.

A

All Ladder Companies, Squads and Rescues

1.1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

If replacement Fast Pak decals are needed what shall be done?

A

RT-2 faxed to MSU.

1.2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Is the regulator the same on position SCBA’s?

A

NO
Position SCBA’s are CBRN protected. FAST PAK is a “Non CBRN”
2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

T/F

The FAST PAK is NOT equipped with a vibralert or heads-up display indicator.

A

TRUE

4.1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

T/F

The only way to monitor the air pressure in the FAST PAK is the cylinder gauge.

A

TRUE

4.1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

T/F
It is essential that one member of the FAST unit is assigned to monitor the actual volume of air remaining in the portable cylinder..

A

TRUE

4.1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

T/F

The UAC is for emergency use only when a member is low or out of air within an IDLH atmosphere.

A

TRUE

5.2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The ___foot HP hose will administer air to a members SCBA via the UAC. This will equalize air in both cylinders in approximately___seconds.

A

5 foot HP Hose.
approximately 60 seconds.
5.3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

T/F

The FAST PAK has a built in check valve hat only permits air to be delivered to a members SCBA.

A

TRUE

5.3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

T/F
If at anytime during the filling process a leak is detected, immediately discontinue the filling procedure and supply via one of he LP methods.

A

TRUE

5.4.6

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

T/F If the dust cap on the UAC of the member’s SCBA is missing, quickly examine and remove any visible debris before connecting into the UAC. If the UAC is impacted or blocked with debris, use one of the LP methods.

16
Q

T?F

In order for the UAC to work BOTH cylinders must have the cylinder valves FULLY OPENED?

17
Q

What member is responsible for protecting the LP hose from high heat, hot embers, sharp objects and entanglement?

A

The member assigned to monitor thee air supply.

6.3

18
Q

T/F

Use of the Schrader Fitting is reserved for the use of SOC units only

19
Q

T/F
The FAST PAK can be used to provide an air supply to non FDNY members when they are trapped in a IDLH atmosphere or confined space.

20
Q

Can any FAST PAK be used for non FDNY members?

A

NO The FAST PAK assigned to the FAST Unit shall not be deployed for this operation. Additional Fast Paks shall be deployed if needed and victims should be removed from the IDLH ASAP. 7.1

21
Q

When is the FAST PAK inspected?

A

At the beginning of each tour and after each use.

9.10

22
Q

If placing the FAST PAK OOS who do you notify?

A

Notify the Battalion and request the Battalion Spare Fast Pak as a replacement.
9.12.2

23
Q

T/F
When FAST PAK use is anticipated, it should be turned on in a clean atmosphere and cylinder pressure gauge checked for FULL indication.

24
T/F Once a FAST PAK is put into operation, the IC shall ensure that a second FAST PAK is readily available at the scene to be used as required.
TRUE | 10.4
25
T/F | Keep all couplings dry at all times. Water on couplings may freeze during low temperatures preventing connections.
TRUE | 10.5
26
/T/F The FAST Unit shall report to and stage near the ICP, within VERBAL contact, at a position from which they can be readily deployed.
TRUE | MMID Ch2 Sec 3.2
27
Officers of units reporting into the CP shall report in alone, after instructing their members to stand by at least___feet from the CP
At least 25 feet from the CP | Regs Ch 11 11.3.25
28
T/F Use the downed members face piece unless it is damaged or missing instead of the facepiece with the FAST PAK.
TRUE | MMID Ch3 sec7.7
29
T/F Once the member is located, a FAST PAK must be called for immediately, regardless of whether the member has air or not.
TRUE Statement | MMID Ch3 sec7.2
30
T/F The air supply of the member needs to assessed whether the member is conscious or Unconscious?
TRUE Statement | MMID Ch3 Sec 7.1
31
If the condition of the distressed members SCBA is in doubt DO NOT provide air via the___Pressure System
UAC HIGH Pressure system. | MMID Ch 3 7.4