***TB SCBA Add 1 FAST PAK Flashcards
(32 cards)
The fitting between the Hansen Fitting and the Low/High Pressure assembly is called the?
Schrader Fitting
C
The fitting on the LP hose before the regulator is called?
Hansen Fitting
B
The Low Pressure hose is___feet long.
20 feet long
D
The high pressure hose is how long?
5 feet long
F
At the end of the HP hose is__?
UAC Universal Air Connection Coupling
g
The FAST PAK is carried by all___,___&___.
All Ladder Companies, Squads and Rescues
1.1
If replacement Fast Pak decals are needed what shall be done?
RT-2 faxed to MSU.
1.2
Is the regulator the same on position SCBA’s?
NO
Position SCBA’s are CBRN protected. FAST PAK is a “Non CBRN”
2
T/F
The FAST PAK is NOT equipped with a vibralert or heads-up display indicator.
TRUE
4.1
T/F
The only way to monitor the air pressure in the FAST PAK is the cylinder gauge.
TRUE
4.1
T/F
It is essential that one member of the FAST unit is assigned to monitor the actual volume of air remaining in the portable cylinder..
TRUE
4.1
T/F
The UAC is for emergency use only when a member is low or out of air within an IDLH atmosphere.
TRUE
5.2
The ___foot HP hose will administer air to a members SCBA via the UAC. This will equalize air in both cylinders in approximately___seconds.
5 foot HP Hose.
approximately 60 seconds.
5.3
T/F
The FAST PAK has a built in check valve hat only permits air to be delivered to a members SCBA.
TRUE
5.3
T/F
If at anytime during the filling process a leak is detected, immediately discontinue the filling procedure and supply via one of he LP methods.
TRUE
5.4.6
T/F If the dust cap on the UAC of the member’s SCBA is missing, quickly examine and remove any visible debris before connecting into the UAC. If the UAC is impacted or blocked with debris, use one of the LP methods.
TRUE
5.4.6
T?F
In order for the UAC to work BOTH cylinders must have the cylinder valves FULLY OPENED?
TRUE
- 4.1
- 4.3
What member is responsible for protecting the LP hose from high heat, hot embers, sharp objects and entanglement?
The member assigned to monitor thee air supply.
6.3
T/F
Use of the Schrader Fitting is reserved for the use of SOC units only
TRUE
6.4 4
T/F
The FAST PAK can be used to provide an air supply to non FDNY members when they are trapped in a IDLH atmosphere or confined space.
TRUE
7.1
Can any FAST PAK be used for non FDNY members?
NO The FAST PAK assigned to the FAST Unit shall not be deployed for this operation. Additional Fast Paks shall be deployed if needed and victims should be removed from the IDLH ASAP. 7.1
When is the FAST PAK inspected?
At the beginning of each tour and after each use.
9.10
If placing the FAST PAK OOS who do you notify?
Notify the Battalion and request the Battalion Spare Fast Pak as a replacement.
9.12.2
T/F
When FAST PAK use is anticipated, it should be turned on in a clean atmosphere and cylinder pressure gauge checked for FULL indication.
TRUE
10.3