Fire Tech Trial Exam Flashcards
(60 cards)
At a high rise CDA building where concrete was recently poured, units should expect that the standpipe will be maintained and capped how many floors below the last poured floor?
3 floors below the most recently poured floor when concrete construction.
As per lofts, cast iron columns will do what when heated at 1100 degrees?
Lose 58 percent of its original strength and its loss is cumulative and NEVER regained
U respond to an alarm activation that turns out to be unwarranted because it was transmitted due to a con Ed utility power fluctuation in the area. In this situation, the proper radio code signal to transmit is a ?
10-40 code 2
Utility power fluctuation is a 10-40 code 2 not a 10-35
If a members group is in the 6x9 tour before Veterans Day and he Mutuals off , does be earn comp time?
Yes
Note: a veteran CAN’T mutual ON to earn comp time
If a veteran sucks up the PCOT on the 6x9 tour before Veterans Day, would he earn comp time?
Yes
If a member (veteran) who is working in his groups the 6x9 tour before Veterans Day goes on emergency leave, does he earn comp time?
No
U can’t be on any type of leave and earn comp time
The lobby control unit on a 10-76 reports into ?
The logistics section chief
If he’s not there, report into the IC
The lobby control unit “leader” should be stationed at the ____ and operate on the _____ channel
Lobby, tactical
U get a complaint about overcrowding in a cabaret in your admin area. Who do you notify?
Admin BATTALION , who will investigate the matter with the admin unit
Note : this is a recent change!!!
As per RBIS, public schools inspected by the BFP require a familiarization drill by field units every ____ years
2 years
If first due Ecc has a dead hydrant, what transmission should be give?
Urgent, 10-70
If u find an unconscious member , what should u transmit with the mayday?
Mayday, “unconscious member”
What would u state when a missing member is discovered?
Mayday, “ missing member “LOCATED”
Would u issue a 2nd alarm for a heavy fire in the cellar of a brownstone?
No it’s not required
What would u transmit for a 1 story taxpayer with an ADVANCED fire in the cellar?
2nd alarm
What would u transmit on arrival for a 4 story row frame with the 3rd floor FULLY INVOLVED from front to rear?
Extra engine and truck
What would u transmit on arrival for a 5 story old law tenement with fire on the 4th and 5th floors?
Extra engine and truck
If ARCS system fails on ch 12, it would be correct to state that the reverse channel is?
Channel 18 and it is available only on the POST radio or UHF mobile radio
Regarding steel construction at taxpayers, a 50 ft beam heated uniformly over its length to 970 degrees will extend approx?
4 inches in length
If steel I beams are restrained from expanding, they will ?
Buckle
T or F
A steel beam that has sagged will contract to its original length as it is cooled
True
BISP ch 4 add 4
One apt in a 5 story MD which has been issued a vacate BC no 2nd means of egress should have its first vacate surveillance when?
Between 72 and 96 hours from the issuance of the vacate order
For a 10-77, which of the first alarm unit(s) would bring the KO curtain?
1st and third due roof FFs
At a buckeye pipeline leak where con rail trains are transporting freight, flag persons with HTs and flashlights shall be positioned at least _____ feet on each side of the incident
1000