Commission Furnaces and Ovens & Commission Draft Control Systems Flashcards
(16 cards)
Where to find Vent and chimney sizing,
8.13.1 or 8.13.2 b 149.1
Where to fin Dampers and attachments
b 149.1 8.22
Where to find A manually operated flue damper shall not be used with
b 149.1 8.27.1
Where to find An incinerator shall not be equipped with a draft hood in code
b149.1 7.33
Ensure that every type of equipment has an engineering design and is approved by recognized standards organizations such as
CSA (Canadian Standards Association) and ULC (Underwriters Laboratories of Canada).
Which equipment requiring additional approval
Field design systems and DFMUA
Provide training to who on the proper use and maintenance of the ducting and exhaust system, ensuring they are well-equipped to manage the system effectively.
operators and maintenance personnel
Pre-Commissioning Checks (3)
Review Design and Documentation
Permit Verification
Safety System Verification
Inspection of Furnace Components (2)
Component Inspection
Installation Verification:
Fuel System Checks (3)
Fuel Line Installation
Leak Testing
Air Purging
Combustion Air System Checks (2)
Air Supply Inspection
Fan and Damper Verification
Performance Testing (2)
Performance Validation
External Static Pressure
Which oven involves the controlled application of heat to promote chemical reactions, such as polymerization or cross-linking, in a material
Curing
Which oven processes involve the removal of moisture or solvents from materials, such as textiles, paper, or coatings, using heat or other methods
Drying
The primary goal is to ensure that the ? system (Oven) effectively and efficiently raises the temperature of the air to the desired level for various industrial processes.
Air heating
What are used for atmospheric generation to remove pollutants, contaminants, or particulate matter from industrial exhaust gases
Scrubbers