Maintain Boilers & Ancillary Equipment Flashcards

(38 cards)

1
Q

The average boiler consumes more than ?? times its initial cost in fuel every year

A

four

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is The purpose of a boiler inspection

A

provide assurance of equipment integrity to minimize safety issues with operating a pressure vessel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Maximum service intervals
1-High press boiler and low press steam boiler
2-low press hot water boiler and unfired boiler
3-Low press organic fluid boiler

A

1- external-1 year internal- 2 year
2- external- 2 year internal-4 year
3- external-2 year internal-3 year

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Inspection should be made three months after initial starting and at regular 6-, 9-, or 12-month intervals thereafter for what

A

chemical analysis of the boiler water on a pressure vessel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is the leading cause of deterioration of the pressure vessel

A

Improper water treatment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

If excessive mud of sludge is noticed during the blowdown what should be done

A

Clean it and the scheduling or frequency of blowdown may need to be revised

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

When shutting down the boiler, the load should be what

A

be reduced gradually and the pressure vessel cooled at a rate that avoids damaging temperature differential that can cause harmful stresses.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Draining the unit too quickly may cause what

A

the baking of deposits that may be present on the heating surfaces

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is an hydrostatic test

A

Pressureize the boiler loops and check inside the boiler for leaks

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What inspection should occur with the owner/operator present

A

The waterside

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Scale on tubes can cause what issues

A

which not only results in lower operating efficiency, but more importantly, can cause overheating of boiler metal
stack temperatures will be elevated

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Water treatment is under the control of who

A

the power engineer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

When your done the water side inspection the pressure vessel interior should be flushed out how

A

with a high pressure hose
In extreme cases, it may be necessary to resort to acid cleaning

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Extreme scale build up in a water tube boiler will do what

A

impede water flow through the heat exchanger
This is especially problematic on coil tube designs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

If a scaling problem exists, it will probably be more noticeable where

A

where the feedwater enters the boiler

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What will result as the soot blanket insulated the tubes

A

Elevated stack temperatures

17
Q

What tool can help wash soot out of a heat exchanger

A

soot washing lances

18
Q

Which gas will experience a build up of a white coating on the fireside of the tubes

A

Boilers firing Digester gas

19
Q

When you are satisfied with the cleaning of the waterside what do you do next

A

Replace all waterside handhole and manhole gaskets

20
Q

The LWCO gaskets can be sprayed lightly with what

A

never-seez to facilitate easier gasket removal next inspection

21
Q

why shouldnt you store serviced valves on the shelf

A

time is expiring

22
Q

Pressure relief devices Max service dates
1-power boiler
steam above 15 psi
HW above 121 degrees Celsius
2-Heater boiler
HW 121 degrees celsius and below
Steam up to 15 psi

A

1- press test 1 year
max service 5 year
2- press test 2 year
manual lift (steam) 1 year
max service ( HW) 6 year
Max service (steam) 5 year

23
Q

Pop test on safety relief valve
Do not hand operate the valve with less than ?% of the stamped set pressure exerted on the underside of the disc

24
Q

Repair of a safety relief valve must be done only by

A

by the manufacturer or his authorized representative

25
How much higher should the safety relief valve be than operating temperature
A 10% differential is recommended
26
What types of nuts are used to bolt on front and rear heads
Brass
27
refractory surfaces are recommended needing what frequently
Wash coating
28
What is used for wash coating on refractories
diluted with water to the consistency of light cream, is used for wash coating
29
Face all joints or cracks by applying what on refractory
high temperature bonding mortar with a trowel or fingertips
30
Should segments of the liner burn away or fall out what should be done
Replace the refractory
31
What should be done when unit paint becomes discolored
Fix the issue and re-paint the unit
32
A stiff mixture of castable refractory can be troweled into place for the door, what do you need to make sure
Make sure the mixture is stiff enough that it doesn’t slump on vertical surfaces
33
Some refractory in 3rd and 4th passes where flue gas temperatures are not as hot can be replaced with what
refractory blanket
34
When applying pulp over rope, how do you do it
Apply a layer of pulp over the rope and the inside of the tadpole gasket. Smooth to approximately 1 inch thick and 2 inches wide
35
What will suffer the same deterioration as the boiler (3)
Deaerators, feed tanks, blowdown tanks
36
How do you do a wet lay up
the boiler must be flooded so there is no water/air separation line in the vessel. The water is chemically treated with corrosion inhibitors.
37
How do you do a dry lay up
the boiler is completely drained with all hand hole and man hole covers removed. Air circulation is promoted in the waterside so it can completely dry out.
38
Which lay up is the best for long term
Dry lay up