P-4
→What is it?
→Setpoint
→Coincidence
→reactor trip (Protection Grade signal)
→Setpoint: reactor trip breakers open
→Coincidence: train associated trip breaker AND bypass breaker open or not connected
P-4
What does it do?
P-6
→What is it?
→Setpoint
→Coincidence
→source range reactor trip block permissive
→Setpoint: >10^-10 amps
→Coincidence: 1/2 IR
P-6
What does it do?
P-7
→What is it?
→Setpoint
→Coincidence
→at power permissive
→Setpoint: none
→Coincidence: P-10 or P-13 met
P-7
What does it do?
P-8
→What is it?
→Setpoint
→Coincidence
→3 loop flow permissive
→Setpoint: >48%
→Coincidence: 2/4 PR channels
P-8
What does it do?
P-9
→What is it?
→Setpoint
→Coincidence
→turbine trip permissive
→Setpoint: >50%
→Coincidence: 2/4 PR channels
P-9
What does it do?
P-10
→What is it?
→Setpoint
→Coincidence
→nuclear at power permissive
→Setpoint: >10%
→Coincidence: 2/4 PR channels
P-10
What does it do?
P-11
→What is it?
→Setpoint
→Coincidence
→PZR SI block permissive
→Setpoint: <1960 psig
→Coincidence: 2/3 protection channels
P-11
What does it do?
P-12
→What is it?
→Setpoint
→Coincidence
→Lo-Lo T-avg permissive
→Setpoint: 553 deg F
→Coincidence: 2/4 channels
P-12
What does it do?
P-13
→What is it?
→Setpoint
→Coincidence
→turbine at power permissive
→Setpoint: turbine power > 10% (PT-505/506)
→Coincidence: 1/2 turbine impulse pressure channels
P-13
What does it do?
P-14
→What is it?
→Setpoint
→Coincidence
→S/G Hi-Hi Level (Protection)
→Setpoint: U1 84%, U2 81.5%
→Coincidence: 2/3 detectors on any 1 S/G
P-14
What does it do?
C-1
→What is it?
→Setpoint
→Coincidence
→IR Rod Stop (prevent reaching IR & PR Hi flux trips)
→Setpoint: IR amps ≈ 20% PR
→Coincidence: 1/2 IR channels
C-1
What does it do?
C-2
→What is it?
→Setpoint
→Coincidence
→PR Rod Stop (prevent reaching PR hi flux trip)
→Setpoint: 103%
→Coincidence: 1/4 PR channels
C-2
What does it do?