Systems Exam 1 - Non-Routine Reporting Flashcards
1-hour Reports
→any emergency classification
→invoking 50.54(x)
(-Security Reportable event)
(-Cyber attack)
4-hour Reports
→valid ECCS actuation
→valid RPS actuation w/critical Rx
→any event requiring new release or notification to an offsite agency
→any shutdown driven by tech specs
8-hour Reports
→loss of emergency assessment capability
→any event resulting in a degraded plant or unanalyzed condition
→valid ESF actuation signal:
RPS w/ Rx not critical
CNTMT isolation or MSIV isolation
AFW
CNTMT Spray
EDG auto start
ECCS
→any event or condition that could have prevented a safety function
→transport of a radioactively contaminated person offsite
In the event of a death on site…
Notify OSHA in 4 hours.
Notify the NRC in 8 hours.
(per STA-501)
Event Discovery Date
the date or time which starts the clock for reports due to regulatory agencies
(typically the date that a CPNPP worker identifies a problem or an issue)
(if the problem requires an engineering evaluation to determine operability or significance, the Event Discovery Date is the date the engineering evaluation is completed)
Safeguards Event
any incident representing and attempted, threatened, or actual breach of the safeguards system or reduction of the operational effectiveness of that system
Byproduct Material
any radioactive material (except special nuclear material) yielded in or made radioactive by exposure to the radiation incident to the process of producing or utilizing special nuclear material.
Special Nuclear Material
Plutonium, Uranium 233, Uranium enriched with the isotope 233 or isotope 235, and any other material (fuel).